Tallapoosa · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 106 - ZONING / Article VII - ADMINISTRATION, ENFORCEMENT, AND PENALTIES
Sec. 106-206. General conditions which require the acquisition of a building permit, various permits and permit fees.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) All construction projects in excess of $100.00 shall be subject to the requirement of acquiring of a building permit prior to work beginning. Projects with a value less than $5,000.00 shall be issued permits with no fee. Permits for projects between $100.00 and $5,000.00 shall be issued if the following conditions are met. This fee structure does not affect electrical, mechanical or plumbing permits; if the building project/repair exceeds $5,000.00, the standard fee shall apply; currently $50.00 for the building permit. Said fee shall be amended by the mayor and council by resolution from time to time:
(1) All projects which include the construction or repair of load bearing elements, such as a deck, porch, roof replacement, detached or attached garage, storage shed, wall, etc.
(2) All projects which have a potential bearing upon a property line of a neighbor or right-of-way line, such as an accessory building (utility or decorative), a deck/porch, new or replacement sidewalk or driveway and a fence; essentially any project which requires a setback inspection.
(b) New home/residential projects in excess of $5,000.00 shall be assessed a fee equal to $0.25 per square foot of heated space. Commercial projects shall be assessed a fee in accordance with the fee schedule contained in the commercial building fees schedule (based upon the total cost of the commercial project). Any mechanical, electrical or plumbing work which exceeds $2,500.00, and on any new home construction work, or which requires an inspection shall be assessed a fee of $50.00. These fees are in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(c) Additions to homes; heated space. The minimum fee charged for this type of permit shall be $50.00. In the case where the heated square footage, when multiplied by $0.25, exceeds the fee of $50.00, the higher fee shall be charged. These fees are in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(d) Moved-in homes and structures (to include manufactured homes), shall have the fee charged for this action based on the square footage of the structure being moved. The square footage shall be multiplied by $0.25 to determine the fee, as done in subsection (b) of this section.
(e) Pool permits. This type of construction requires inspections to verify proper plans design, setback and grounding. The fee for any permanent pool (a structure which shall not be dismantled each winter) shall be $75.00 and include all inspections related to the construction of a pool, either above or below/in-ground. This fee is in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(f) Renovation/remodeling permits. Any work in which the construction project is addressing an existing structure, and the construction work value exceeds $5,000.00, a permit must be purchased. The permit fee shall be $50.00. In the case of major renovations, an initial evaluation shall be conducted by the city inspector and all necessary work and additional permits (mechanical, plumbing, electrical) shall be identified. If needed, the additional permits shall be purchased at the standard price for such a permit. This fee is in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(g) Grading permits shall be required when the ground is disturbed in preparation of, or during a construction project. The fee for this permit shall be $25.00 per parcel being developed under one acre (44,000 square feet). Grading projects which exceed one acre shall be charged an additional fee of $25.00 per additional acre. Farming and gardens are exempt. This fee is in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(h) (1) Demolition permits. The fee for a demolition permit shall be $50.00 and shall require the city inspector to conduct a preliminary evaluation of the structure to identify potential asbestos contamination. If the city inspector can detect no asbestos, then the demolition shall be permitted to proceed. This fee is in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(2) Fire-damaged homes. Owners of homes which have been damaged to such an extent that they are no longer inhabitable shall be required to efficiently address the damaged house, either through demolition or repair. Either a demolition permit, or a repair building permit must be obtained no later than 90 days after the fire which damaged the building occurred.
(i) Right-of-way (ROW) permits. Any activity within the city ROW which alters the use of, or appearance of, or installs a permanent improvement, such as the proposal to construct a masonry mailbox, a retaining wall, any and all new ditching or piping, driveway cuts where there is city curb and which shall require a cement driveway cut/ramp/entry, extending at a minimum to the edge of the city ROW, install a tree, etc., is hereby required to submit to the city an application for ROW improvement permit. All such projects which affect the ROW of the city must receive permission from the city prior to proceeding. Said application shall be submitted to the department of planning or the city manager or his designee upon a form supplied for that purpose by the city. Said application shall be reviewed by the department of public works, planning and any other needed city department and shall be approved or denied, and if denied, reasons for the denial being annotated; said approval/denial shall be completed no later than 14 days after a complete application has been submitted. The application shall not be complete until adequate drawings depicting the planned improvement and payment of the $25.00 permit application fee has been received. The right-of-way permit shall require any and all utility companies, and/or their sub-contractors, wishing to install or make changes to any and all equipment and/or facilities in the right-of-way owned by the city, such as, but not limited to, Comcast Cable, AT&T, BellSouth, Georgia Power, including tree removal or trimming activity, to obtain a ROW permit prior to work beginning. Driveway cuts where there is no existing city curb and no required piping shall be exempt. This exemption shall be determined by the city. This fee is in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(j) Re-inspection fees. In the event that the city is requested to conduct a progress inspection of a project and that project is for whatever reason unready to be inspected or fails said inspection, a $25.00 re-inspection fee shall be charged. This fee is in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(k) Site plan/building plan/plat plan review. The review of preliminary and final site/plat plan review shall require the payment of $50.00 per requested plan review (preliminary and final). Additionally, there shall be an $8.00 recording fee charged for final plat recording.
Commercial building plan review shall require a payment, included at the time the building permit is purchased or plans submitted, of $50.00. House plan review shall require a payment of $25.00 per building permit issued, at the time the building permit is purchased. These fees are in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution. Plat review where no new road is planned and one parcel is divided only into two or three parcels (minimum of five acres per parcel) shall be completed for no fee, except the recording fee. Project site review which consists of an extension of public sewer or water, or which consists of a private sewer and water system extension that requires an engineering review by the city engineer; shall be subject to city engineering review fees. These fees shall be in addition to the standard site plan review. The applicant/developer shall be responsible for paying these fees. An estimate shall be provided to the developer/applicant at the time the plans are submitted. Review of these plans shall not occur until this fee has been paid. If the end cost of the review exceeds the paid estimate fee, applicant/developer shall be responsible for paying the additional fee to the city. Failure to do so will prevent a building permit being issued to the applicant/developer for this, and any other project the applicant/developer has within the city limits; additionally, a stop work order may be issued for in-progress construction projects of a developer who fails to pay all city engineering fees.
(l) Building permit requests from nonprofit organizations(including churches, public schools and any organization recognized as a 501c3 organization by the IRS), shall have all required permits issued to, and the inspections required and performed, at no charge (free), provided that the contractor completing the work is doing so pro bono (for no charge/free). This fee-free status is in effect as of the date of adoption of the ordinance from which this chapter is derived and may be changed from time to time by the mayor and council by resolution.
(m) Building permit applications in MFR districts. Each dwelling unit proposed in an MFR district, or any project which proposes multiple dwelling units under a single roof, shall be treated as a distinct construction project, with each dwelling unit having a separate building permit, plumbing, electrical and mechanical permit (each with a separate fee) being issued.
Additionally, each dwelling unit shall be subject to the requirement that a new sewer and water tap be purchased.
History
(Ord. No. 01252, § 106-93, 12-12-2005)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.