A. Decal to be placed on sign. The owner of any sign shall be responsible for retaining the permit for every sign fabricated, installed or maintained for which a permit is required by this article. The permit shall contain the permit number, date of installation of the sign, and the voltage of any electrical apparatus installed on the sign. Such permit shall be kept on the premises on which the sign is located and shall be presented promptly upon request by the building official. In addition to such records, the building official shall issue a decal bearing the number of the permit that the permit holder or his or her agent shall affix to the lower right hand corner of the sign. The absence of a decal evidencing approval of the sign shall be prima facie evidence that the sign has been, or is being, erected or maintained in violation of the standards of this article. B. Sign inspections. The building official shall perform field inspections to determine that all signs being altered, erected, replaced, reconstructed, expanded, relocated or used comply with the standards of this article and the conditions of issuance of the permit. C. Compliance inspection. The sign owner shall be responsible for contacting the building official to arrange for an inspection of the sign within the six months following the date of permit issuance. In the event the sign(s) for which a permit has been issued have not been completely installed and an inspection performed certifying compliance of the sign with this article and the conditions of the permit within six months of the date of permit issuance, such sign permit shall become null and void. The inspection shall be conducted by the building official pursuant to the provisions of this article, the standard building code, as amended and all other applicable codes and ordinances. D. Notice. The building official shall rely on the contact information provided in the sign application for purposes of notifying the owner.