Sec. 98-7.4. Building permit required.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. The owner, authorized agent or contractor who seeks to construct, enlarge, repair, move, demolish or otherwise alter a building, or to install, alter, repair, remove, convert or replace any electrical, gas, mechanical, plumbing or fire sprinkler system, the installation of which is regulated by the construction codes of the city, or to cause any such work to be done, shall apply to the building official and obtain the required permit for the work prior to commencing any such work. No building or other structure shall be located, erected, moved, added to, or structurally altered prior to issuance of a building permit by the building official.

No building permit shall be issued except in conformity with this chapter.

B. Penalty for commencing work prior to issuance of a permit. Any person who initiates construction of a building or alteration of land prior to obtaining a building permit or any other required permit shall be subject to a fine equal to twice the amount of the specified fee.

History

The history line the source prints at the end of the section.

(Ord. No. 1166, § 1(Exh. A), 4-5-22)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:thomaston/zoning/98-7.4@2026-11-11-5ac0a7c163

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Thomaston Zoning Ordinance, Sec. 98-7.4. Building permit required | Georgia Commons