Skip to content
Georgia Commons
Menu

Troup County · Zoning Ordinance

Appendix B - LAND USE AND ZONING / Article X - SIGN REGULATIONS

Sec. 10.15. Administration and enforcement.

About this text

  • As published by Municode, current through 2026-06-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(1) Permit required. Except as exempted from obtaining a permit, all persons desiring to post, install, erect, display, expand, relocate or substantially change a sign regulated by this article within the County, shall first obtain a sign permit and all other permits required for the desired structure in accordance with County ordinances. A change in the copy of a sign shall not constitute a substantial change. However, a change in the mode of message conveyance (i.e.

from screen-print panel to LED) shall be considered a substantial change requiring a sign permit.

(2) Application requirements. Applications for sign permits, along with the non-refundable application fee, shall be submitted by the sign owner or the owner's agent to the Community Development Director on the form furnished by the County. Only complete applications will be accepted. Applications shall include the following:

(a) The road or street address of the property upon which the sign is to be located. In the absence of a road or street address, the parcel identification number as

assigned by the Troup County Tax Assessor shall be given.

(b) The name(s) and address(es) of all owners of the real property upon which the sign is to be located.

(c) The name, address, contact information and occupational tax certificate number

and issuing jurisdiction of the sign contractor/installer.

(d) Written consent of the owner or owner's agent specifically granting permission

for the placement of the sign as proposed.

(e) The types of sign, height, face area and total cost of sign construction or installation.

(f) For free-standing signs, a site plan, drawn to scale, showing the location of the

proposed sign in relation to property and right-of-way lines (or edge of pavement, as appropriate), acreage of the parcel,

location of driveways and parking spaces, public or private easements, and building locations.

(g) For building signs, a to-scale drawing or photo-simulation of the building face upon which the proposed sign is to be installed showing the placement of the sign upon

the building, dimensions of the wall and sign and its height from ground level.

(h) Construction and/or fabrication details of the proposed sign, including certification as to conformance with all structural and wind-load resistive standards of the building code by a qualified structural

engineer, or prepared using standard drawings prepared by a structural engineer or other qualified professional meeting, or exceeding all requirements of the building code, if applicable.

(i) Whether or not the sign is to be illuminated and the method of illumination.

(3) Time for consideration and issuance of permit. The County shall process all sign permit applications within 30 days of the County's actual receipt of a complete application and application fee for a sign permit. Revisions or amendments to an application shall extend the review period to 20 days from the date of submission of the revision or amendment. Revisions or amendments received after the issuance of a permit shall constitute a new application.

(a) The Community Development Director shall reject any application as incomplete that does not include all items required for a sign permit application as set forth under subsection (2) of this section.

(b) The Community Development Director shall reject any application containing false material statements or omissions.

Any rejected application later resubmitted shall be deemed to have been submitted on the date of resubmission instead of the original date of submission.

(c) Within 30 days of receipt of a complete application, the Community Development Director shall:

(i) Issue the permit; or (ii) Inform the applicant in writing of the reasons why the permit cannot be issued.

Failure of the Community Development Director to act on a sign permit within 30 days shall result in a denial of the application.

(d) Upon determination that the application fully complies with the provisions of this article, the building code, and all other applicable laws, regulations and articles of the County code, the sign permit shall be issued by the Community Development Director.

(e) If it is determined that the application does not fully comply with the provisions of this article, the building code and all other applicable laws, regulations and

articles of the County code, the Community Development Director shall reject the application and notify the applicant of the decision and reason(s) for the

denial of the permit. The Community Development Director shall give such notice in writing by hand delivery, mail, e-mail or fax using the contact information provided on the application. The notice shall be post-marked or otherwise date-stamped on or before the 30th business day following the date of the completed application's receipt by the

County. A denial pursuant to this section shall be appealable pursuant to the appeal procedures of this article.

(4) Permit fees. A sign permit shall not be issued unless the appropriate permit fees, as established by the County commission, have been paid. No refunds of permit fees will be made for sign permits that expired due to failure to erect the subject sign. If a person desires to erect a sign in the same location as for any expired permit, a new application must first be processed and another fee paid in accordance with the fee schedule applicable at such time.

(5) Expiration of permit. A sign permit shall become null and void if the sign for which the permit was issued has not been completed and fully installed within six (6) months of the date of issuance, provided, however, that a 90-day extension shall be granted if a written request for extension is received by the Community Development Director prior to the expiration date of the initial permit.

(6) Appeals. Appeals from an administrative decision by the Community Development Director may be made by any person aggrieved, or by any officer, department, board, or bureau of the County affected by any decision of the Community Development Director or other County official based on this article. Such appeal shall be taken and exercised in accordance with the appeal provisions for the Zoning Ordinance for the County as contained in this Code as the same may now exist or hereafter be amended. Any such appeal shall be to the Board of Zoning Appeals and Planning Commission, which shall hear and decide whether there is an error in any order, requirement, decision or determination made by the Community Development Director or other County official based on this article.

History

The history line the source prints at the end of the section.

(Ord. No. 2025-03, 6-3-2025)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:troup-county/zoning/10.15@2026-06-16-f2159a8047

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Troup County Zoning Ordinance, Sec. 10.15. Administration and enforcement | Georgia Commons