--- title: Troup County Zoning Ordinance, Sec. 14.5. Procedures for Subdivision on Substandard Roads collection: local-codes id: local-code:troup-county/zoning/14.5 cite_as: Troup County, Ga., Zoning Ordinance § 14.5 canonical_url: https://georgiacommons.org/code/local/troup-county/zoning/14.5 md_url: https://georgiacommons.org/code/local/troup-county/zoning/14.5.md text_url: https://georgiacommons.org/code/local/troup-county/zoning/14.5/text source_url: https://library.municode.com/ga/troup_county/codes/code_of_ordinances date: 2026-06-16 status: active jurisdiction: county:troup jurisdiction_name: Troup County county_fips: "13285" corpus_version: local-codes-troup-county-7a9c065e873c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/troup-county/zoning/~appendix-c/~article-14.md previous: https://georgiacommons.org/code/local/troup-county/zoning/14.4.md next: https://georgiacommons.org/code/local/troup-county/zoning/15.1.md index: https://georgiacommons.org/code/local/troup-county.md branch: zoning edition: As published by Municode, current through 2026-06-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:troup-county/zoning/14.5@2026-06-16-08b0a9d2b9 --- # Troup County Zoning Ordinance, Sec. 14.5. Procedures for Subdivision on Substandard Roads > As published by Municode, current through 2026-06-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - DEVELOPMENT AND PERMITTING / Article 14 - SUBDIVISIONS 1. The purpose of this ordinance is to regulate the subdivision of land along substandard roads in Troup County to ensure compatibility with existing infrastructure, protect public safety, and promote the county's best interests. This ordinance establishes criteria for such subdivisions, requiring thorough review, justification, and impact analysis to safeguard the integrity of the county's transportation network and community welfare. 2. Subdivision Allowance on Substandard Roads. A. General Allowance. Subject to the conditions below, subdivisions of property with frontage on or access via a substandard road are permitted, notwithstanding other provisions of the Troup County Development Code: 1. Minimum Lot Size: Each resulting lot shall have a minimum area of 50 acres. 2. Access: Each lot must have verified legal and physical access to the substandard road, suitable for emergency vehicle use, as determined by the Troup County Community Development Department. 3. Compliance: The subdivision must adhere to all applicable zoning, environmental, and land use regulations of Troup County. B. Prohibition and Improvement Requirement. Subdivisions creating lots smaller than 50 acres along substandard roads are prohibited unless the road is upgraded to meet Troup County Road Standards, as verified by the County Engineer, prior to approval. C. Justification and Impact Analysis. Applicants proposing subdivisions along substandard roads must submit: 1. Statement of Necessity: The applicant shall provide a written statement detailing the justification of selecting a substandard road site, including why alternative locations with adequate road infrastructure are infeasible or less suitable. 2. Trip Generation Study: The applicant shall submit a trip generation study analyzing the projected vehicular traffic demand resulting from the proposed subdivision, consistent with the most current Institute of Transportation Engineers (ITE) Trip Generation Manual or equivalent methodology approved by the County Engineer. 3. Traffic Impact Study: As determined by the County Engineer, the applicant may be required to submit a traffic impact study evaluating the subdivision's effect on the existing road network, including but not limited to: i. Roadway capacity and operational analysis, ii. Sight distance and safety considerations, and iii. Potential mitigation measures if deemed necessary. 4. D. Waiver Provision. The Troup County Board of Commissioners may grant a waiver allowing lots smaller than 50 acres along a substandard road if the applicant demonstrates: i. A unique hardship or significant public benefit justifying the waiver, ii. Proposed road improvements or other mitigation measures deemed sufficient by the County Engineer, and iii. Compliance with all other requirements of this ordinance. Waiver requests must include a detailed justification and be approved by the Board of Commissioners. (Ord. No. 2025-03, 6-3-2025) [Sec. 14.6.] Review and approval process. A. Initial Review. 1. The Troup County Engineer and Community Development Director shall evaluate subdivision requests along substandard roads for compliance with this ordinance and alignment with the county's best interests, including public safety, infrastructure capacity and the comprehensive plan. 2. If compliant and deemed beneficial, the request may proceed to the Board of Zoning Appeals and Planning Commission (BOZAPC) and the Troup County Board of Commissioners final review. B. Subdivision Plan Submission. Applicants must submit a subdivision plan to the Troup County Planning Commission, including: 1. A survey showing proposed lot lines, acreages, and existing topography. 2. Documentation verifying legal and physical access to the substandard road. 3. The Statement of Necessity, Trip Generation Study, and any additional materials required by the County Engineer or Planning and Zoning Department. 4. Major or Minor Subdivision Requirements: If the request to subdivide on a substandard road is approved, the applicant shall then follow the requirements and approval process for a major or minor subdivision in accordance with the regulations of this ordinance and the Troup County Unified Development Ordinance. (Ord. No. 2025-03, 6-3-2025) [Sec. 14.7.] Standards for required improvements. (1) Blocks. (a) Length, width, and shape of blocks shall be determined with regard to: (i) Provision of adequate building sites suitable to the special needs of the type of use contemplated. (ii) Zoning requirements as to lot size and dimensions. (iii) Need for convenient access, circulation, control, and safety of road and street traffic. (iv) Limitations and opportunities of topography. (b) Pedestrian easements, not less than 10 feet wide, may be required where deemed essential to provide circulation, or access to schools, playgrounds, shopping centers, transportation and other community facilities. (c) On cul-de-sacs or dead-end roads and streets, the desirable maximum length is 600 feet. (2) Lot specifications and dimensions. (a) The lot arrangement shall be such that there will be no foreseeable difficulties, for reasons of topography or other conditions, in securing building permits to build on all lots in compliance with County regulations and in providing safe driveway access from an approved road or street with adequate sight distance to allow building on such lots. (b) In general, side lot lines shall be at right angles to road or street lines (or radial to curving street lines) unless a variation from this rule gives a better road, street or lot plan. (c) Lot size, dimensions and setback lines shall conform to the requirements of the Zoning Ordinance. (d) Lots meeting size requirements are not automatically approved for development. Troup County Health Department must approve all individual sewer systems and/or water supplies. (e) Corner lots for residential use shall have an extra width, to permit appropriate building setback from and orientation to both streets. The "front" setback distance shall be used along both road and street frontages according to the zoning district in which the property is located. The "rear" setback shall be determined by the orientation of the principle structure. (f) Each lot shall front upon a public road or street, except as specified for Private Subdivisions. (g) Double frontage, and reverse frontage lots, shall be avoided except where topography prevents single road or street frontage, or to provide separation of residential development from through road or street traffic. A planting screen reservation of at least 10 feet with no drive access shall be provided across the width of the property along the line of lots abutting such a through road or street. (h) No subdivision shall occur wherein a lot will be created of a size ranging between five (5) acres and 10 acres, inclusive, unless said lot has a minimum ratio of one foot of road or street frontage for every four (4) feet of lot depth. (i) "Flag" and "pie" lots shall be avoided (please see definitions). All lots shall meet the requirements of the zoning district in which the property is located. In the case of "slice of pie" lots no rear property line shall be less than five (5) feet. (3) Additional standards for subdivisions in the Commercial and Industrial Corridor area, and the UR-VL zoning district: Major subdivision developments along scenic corridors shall be designed to contain all interior lots, where feasible. (4) Additional standards for subdivisions along Commercial and Industrial Corridors and within UR-VL zoning districts: (a) Circulation. (i) Adequate circulation drives shall interconnect all lot access points with all vehicle parking, loading, servicing and like areas and structures, thereby creating an onsite circulation network which, together with any service drives abutting the lot, will provide a safe and convenient means for lot servicing and fire protection. (ii) Circulation drives used by vehicles to reach a drive-by sales or service window, depository or similar facility shall be one (1)-way and shall be of sufficient length to prevent a line of waiting vehicles from backing up into a road or street or onto adjoining property. (iii) Coordination of pedestrian and vehicular circulation patterns shall be encouraged between adjacent property owners. (iv) For all uses providing clientele parking, all circulation drives shall be clearly defined and marked appropriately with signage, striping, arrows and the like to assist public circulation into, on and out of the property, and through parking lot areas. (v) Unless a curb cut is along a statemaintained highway and is required to meet Georgia Department of Transportation Standards, then the driveway width shall not exceed 30 feet, unless approved by the County Engineer. Curb cuts shall be no closer than 45 feet to other curb cuts or closer than 100 feet to any road or street intersection. All separations are measured at the radius return back of curb to the right-of-way line. Distances between curb cuts shall be measured from back of curb to back of curb at the radius return between the closest edges of the cuts. One (1) curb cut shall be allowed per 150 feet of frontage, up to two (2) cuts per single lot. Existing lots with less than 150 feet of frontage shall be allowed one (1) curb cut. (vi) Vision clearance shall be provided at all intersections. No obstruction to vision between two (2) and one (1)-half feet and 10 feet from ground level shall be permitted within 20 feet of the intersection of two (2) roads or streets or railroad track, or of a road or street intersection with a railroad track. (b) Access. (i) Access shall be designed so as not to impede traffic on a public road or street intended to carry through traffic. (ii) Access shall comply with the following requirements: (A) Access to the site is provided by a public road or street other than one (1) intended to carry through traffic; and/or (B) Access to the site is provided by a functional frontage road, street, service drive or joint driveway which provides controlled access to the site and/or several adjacent sites; and/or (C) Acceleration/deceleration lanes, turning lanes and/or stacking lanes are provided to improve access to the site and/or several adjacent sites. (iii) The Georgia Department of Transportation driveway manual "Regulations for Driveway and Encroachment Control" shall be used as a design guide. (iv) All areas subject to vehicular traffic including frontage roads, access ways, loading areas and service areas shall be designed and constructed to withstand the expected traffic flows based upon the intended use. (v) Sidewalks and handicap access. A five (5)-foot (5) sidewalk along all adjacent road or street R.O.W. is required. Handicapped access and ramps shall be located at the corner of all intersections, at any designated pedestrian crossing of any road or street at mid-block, and at any parking lot adjacent to any public or private use. Internal sidewalks, pedestrian paths and handicap access shall also be provided within the non-residential uses. (vi) Curbs. All new roads or streets, whether public, private or internal parking lot driveways, shall be curbed with 24 inches vertical curb and gutter. Curb and gutter in D.O.T. right-of-way shall be 30 inches. (5) Shared driveways. Shared driveways shall be permitted based on the following standards. (a) Shared driveways shall be permitted for no more than two (2) adjoining lots. (b) The shared driveway shall provide a minimum 20 feet of driveway width at the edge of the road, street or thoroughfare pavement. (c) Shared driveways shall meet all applicable driveway spacing standards of this UDO. (d) Variances may be applied for and approved by the Community Development Director, Community Development Director and County Engineer. (Ord. No. 2025-03, 6-3-2025) [Sec. 14.8.] Streets and/or roads. (1) Public streets and/or roads. (a) Specifications not covered herein shall be performed in accordance with the latest Georgia Department of Transportation and AASHTO standard specifications. (b) The arrangement, character, extent, width, grade and location of all roads and streets shall conform to the Comprehensive Plan. New roads and streets shall be considered in their relation to existing and planned streets, topographic conditions, public convenience and safety, and in their appropriate relation to the proposed uses of the land to be served by such roads and streets. (c) When such is not shown in the Comprehensive Plan, the arrangement of roads and streets in a subdivision shall either: (i) Provide for the continuation or appropriate connection to existing principal streets in surrounding areas; or (ii) When future connectivity is required, the right-of-way for the future road or street may be recorded without constructing the street provided the right-of-way is no longer than one (1) lot depth. (iii) Conform to a plan for a neighborhood approved or adopted by the County commissioners to meet a particular situation where topographical or other conditions make continuance or conformance to existing roads or streets impracticable. (d) Minor roads and streets shall be so laid out that their use by high volumes of through traffic will be discouraged. (e) Where a subdivision abuts or contains an existing or proposed through road or street with speed limit greater than 35 mph access shall be limited to ensure adequate protection of residential properties and maintain public safety. The following measures may be imposed by the Board of Commissioners: (i) Deceleration stacking lane with taper. (ii) Acceleration lane with taper. (iii) Left turn stacking lanes with tapers. (iv) Reverse frontage lots with screen planting strip along the rear property line or such other treatment as may be necessary to afford adequate separation from through road or street. (v) The most recent version of the GDOT Driveway Manual "Regulations for Driveway and Encroachment Control" shall be used as a design guide. (f) Where a subdivision borders on or contains a railroad right-of-way, or limited access highway right-of-way, the Board of Zoning Appeals and Planning Commission may require a road or street approximately parallel to, and on each of side of, such right-of-way, at a distance suitable for the appropriate use of the intervening land (such as parks in residential districts). Such distance shall also be determined with regard for the requirements of approach grades and future grade separations. (g) Privately owned reserve strips controlling access to roads or streets shall be prohibited. (h) Road and street jogs with centerline offsets of less than 125 feet shall be prohibited. (i) Road and street intersections should be as nearly at right angles as practical. (j) Roads and streets designed according to the provisions of sec. 14.5(4)(b)(vi) shall not be required to have curb and gutter. All other road and street right-of-way widths shall be no less than 50 feet with curb and gutter. Larger right-of-way widths are required for some roads and streets. (k) Dead-end roads and streets may be platted subject to the approval of the Board of Commissioners. (i) Dead-end streets, designed to be so permanently, shall be provided with a turnaround or cul-de-sac at the closed end. Installation shall conform to the latest County road and street specifications. (ii) Dead-end roads and streets that are designed to be so temporarily shall have a temporary turnaround or cul-de-sac as a part of the construction. Said condition shall be shown on the final plat presented to the commissioners for approval. InstalDEVELOPMENT AND PERMITTING § 14.8 lation shall conform to the latest County road specifications. The temporary cul-de-sac may not lie on any portion of a lot in the subdivision phase to be approved by the commissioners. At the time the final plat is recorded, the subdivider or his agent shall present a bond payable to the County of a type approved by the County. In the event the road or street is not extended within two (2) years, the cul-de-sac shall be permanently constructed or the bond shall be payable to the County to make the cul-de-sac permanent or the bond may be extended at the discretion of the Troup County Commissioners. (l) No road street name shall be used that will duplicate or be confused with the names of existing roads or streets. Proposed roads or streets in obvious alignment with existing and named roads or streets shall bear the name of the existing road or street. Road or street names shall be subject to the approval of the board of County commissioners. (m) Clearing. All trees, stumps, brush, topsoil, old foundations or other building materials shall be cleared from all rights-ofway. No tree stumps, or other debris shall be deposited within the right-ofway. (n) Grading. Roads and streets shall be graded to provide for a width of pavement in the center of the right-of-way to conform to a profile and cross-section approved by the County engineer. (o) Road and street grades shall conform to the latest Troup County road specifications and with allowance for reasonable vertical curves, shall not exceed a maximum of 12 percent. No roads or streets shall have a grade of less than one (1) percent except in vertical curve reversals. (p) Roads and streets designed according to the provisions of sec. 14.5(4)(b)(vi) shall not be required to have curb and gutter. Curb and gutter shall be required on all other roads and streets and shall be furnished and installed by the subdivider or his agent in conformance with the latest County road and street specifications. Distance from back of curb to back of curb must not be less than 25 feet. (q) Base and paving: Paving of a minimum width of 25 feet from back of curb to back of curb shall be furnished and paid for by the subdivider or their agent. Installation shall conform to the latest County road department specifications. The typical paving cross section for a proposed County road or street shall be designed using the Georgia Department of Transportation's "APD" (Asphalt Pavement Design) calculator based on the 1972 AASHTO Interim Guide for Design of Pavement Structures. The minimum acceptable typical paving cross section shall be: • 1�" type "E" asphalt wearing course. • 2" type "B" binder. • 6" G.A.B. (Graded Aggregate Base). The asphalt-wearing course must be laid after a period of at least one (1) year after the roads or streets have passed final inspection and the final plat has been recorded. A performance bond is required per sec. 14.8. (r) Cul-de-sac shall have a minimum radius of 50 feet to the right-of-way, and a minimum radius of 42 feet to the back of curb. (s) Testing thickness and compaction. The County inspector shall make as many tests as necessary to determine the average thickness and compaction of the base course prior to placing of surface course. Tests shall also be made on the finished courses if necessary. When the subdivider or his agent or contractor disagrees with the County inspector's tests and prefers a consulting firm to be employed, said consulting firm shall be employed at the subdivider or his agent's expense. (t) Access to subdivisions shall be provided over a public street or road. Where subdivisions abut a public road or street that has a right-of-way width of less than 50 feet (Larger right-of-way widths are required for some roads), the subdivider or their agent shall dedicate additional land to provide a width of 25 feet (or half the total width required) on the subdivider's side of the centerline. Where public roads or streets less than 50 feet (Larger right-of-way widths are required for some roads) traverse subdivisions the subdivider or his agent shall dedicate additional land to provide a width of 25 feet (or half the total width required) on both sides of the centerline. Nothing herein shall be construed to obligate the County or subdivider or his agent to improve such road or street frontage. (u) Approval may be denied on a proposed subdivision where the County commissioners deem a public road to the subdivision as being inadequate due to right-ofway width or construction until such time as the road has been brought up to County standards. (v) Driveways within the right-of-way shall be constructed according to specifications of the County road department and [appendix C] article 6 of this UDO. (w) The subdivider or their agent shall furnish and install required striping and road or street name signs at all proposed road or street intersections during construction of the roads or streets. The signs shall use six (6)-inch (6) white letters on blue background. The Troup County Department of Roads and Engineering must approve road or street name signs of special design. Subdivision entrance markers are not permitted within the existing or proposed public right-of-way. (x) Inspection. The County inspector shall be notified prior to each phase of construction. All road or street construction shall be done under the direct inspection of the County inspector. (2) Private access roads. (a) Private access roads shall be permitted in subdivisions in areas zoned in AG, AG-R, SU-R, LR, SU-VL, and UR-VL. (b) Private access roads shall adhere to the following standards: (i) All private access roads shall be a minimum of 50 feet in total width, shall have no less than a 20-foot wide paved section, and shall be constructed to the specifications shown on Figure 1 that is incorporated herein by reference. Existing unpaved private access roads that are documented on the Troup County roads map shall be permitted to enable subdivisions for parcels having access to such roads. (ii) All private access roads that dead end shall provide for a turnaround of sufficient size to allow for emergency vehicles to enter and leave without having to make more than one (1) backing movement. The turnaround and the entrance to the private road shall not be blocked in any manner so as to prevent the access and egress of emergency vehicles. (iii) All private access roads shall be a jointly owned easement and maintained by all lots served by the easement. Prior to approval of the final subdivision plat, the owners and/or subdivider or his agents shall present an agreement binding on the property owners and their successors and/or assigns that shall provide a mechanism for the perpetual maintenance of the road. Said agreement must receive the approval of the Board of Commissioners prior to recording the final plat. (iv) All lots served and/or accessed by the private access road shall comply with the frontage requirements as stated in [appendix b section] 4.1 of this UDO. (v) No private access road shall be allowed to serve as the means of ingress and egress for more than six (6) dwelling units. (vi) Private access roads shall only provide ingress and egress for dwelling units that are located within the approved platted subdivision. (vii) The final subdivision plat shall contain notations in a form acceptable to the County that all private access roads are private and are not maintained by Troup County. The homeowners of those lots shall jointly own all private access roads served by the road. All private access roads shall be perpetually maintained pursuant to an agreement binding the lot owners, their successors and assigns. (3) Subterranean improvements. (a) Utilities shall be installed within the right-of-way of a proposed road or street in accordance with the Troup County Utilities Standard available from the Troup County Engineer. (b) No underground work shall be covered or concealed until inspected and approved by the County inspector. (c) Water lines. Each lot within the subdivision shall be provided with a connection to a water supply. Individual water systems shall be subject to the approval of the Troup County Health Department. Public and private water systems and all connections shall comply with the regulations of the Georgia Department of Natural Resources and shall be subject to the inspection and approval of the County inspector. (d) Sanitary sewers (where available). Each lot within the subdivision area shall be provided with a connection to a sanitary sewerage system. The sewerage system and all connections shall comply with the regulations of the Georgia Department of Natural Resources and the utility owner, and shall be subject to the inspection and approval of the utility inspector. (e) Septic tanks may be permitted wherever sanitary sewerage is not available. Design data shall be submitted to the Troup County Health Department in accordance with regulations of said department. (f) In the Commercial and Industrial Corridors and within UR-VL zoning districts: (i) All utility lines serving uses proposed or developed within the commercial and industrial corridors, including electric, telephone, data and cable television, shall be installed underground within the roadway buffer and development setback area. (ii) Underground utility trenches must be re-vegetated. Utility boxes and cabinets that are now or must, by necessity, be located above ground must be shielded from view from the commercial and industrial corridors with existing vegetation and/or re-vegetation. (iii) Any above-ground boxes that cannot be buried shall, in addition to being screened by vegetation, shall be painted a neutral or earth tone color or otherwise made to blend in with their surroundings. (iv) All utilities meter, panels, disconnects, terminals, cabinets, etc. shall be located in the rear or side of the building and away from high traffic and high visibility areas. (4) Surface drainage specifications. (a) The size, length and location of all surface drainage pipe and structures shall be subject to the approval of the engineer. In no case shall water be allowed to discharge at a point where damage would be caused to any adjacent property. (b) All storm drainage pipe shall conform to Georgia Department of Transportation Standards, particularly including but not limited to, designs of cross drain pipes, longitudinal pipes, gutter flows, side ditch flows and appurtenances thereto. (c) Any lots within subdivisions that in the opinion of the County building inspector, are unfit for building due to bad drainage conditions shall be excluded, and no building shall be permitted until such conditions have been corrected. (d) Installation, backfilling and compaction shall be in accordance with Georgia Department of Transportation Standard Specifications. (5) Easements. (a) Utility and drainage easements shall be provided as required by the Board of Commissioners. (b) The easement is not necessarily maintained by Troup County. (c) A 10-foot utility and drainage easement shall be located along the front, side, and rear lines of each lot. The easement is not necessarily maintained by Troup County. (6) Soil erosion and sedimentation. (a) Required plan. A plan, approved by the Natural Resources Conservation Service, that meets the criteria of the then current edition of the "Manual for Erosion and Sediment Control in Georgia," shall be required on all subdivisions prior to any clearing or grading. Immediate action shall be taken by the subdivider or his agent, at his expense, to correct any soil erosion that occurs as result of his construction activities, whether in conformance with the plan or not. (7) Appeals. (a) The Appeals Board for Subdivisions and Road Specifications is hereby created. (i) The board shall consist of three (3) regular members appointed by the Board of Commissioners. Initially, one (1) member shall be appointed for a term of one (1) year, a second member shall be appointed for a period of two (2) years, and a third member shall be appointed for a period of three (3) years. Thereafter, they shall be appointed for a term of three (3) years. An alternate member shall be appointed for a term of three (3) years to serve in the event of conflict of interest of a regular member. (ii) The board shall have the power to hear and decide appeals of the subdivider or his agent regarding decisions made by the County engineer where there is an alleged error in the interpretation of the standards of this article or of the road design specifications. (iii) Appeals from the decision of the subdivision review board shall be taken to the appropriate courts. (b) The subdivider or his agent may appeal the decision of the County engineer in the application of the standards of this article or the Troup County road specifications to the subdivision review board. (c) An appeal from the decision of the County engineer must be made in writing and filed with the Community Development Department within 15 days after the decision is rendered. A meeting of the subdivision review board will be called within 30 days of filing the appeal. (d) The subdivision review board shall reach a decision without unnecessary delay and in all cases shall take action on an appeal within 30 days of submission. (Ord. No. 2025-03, 6-3-2025) [Sec. 14.9.] Bonds. (1) Maintenance bond for existing roads and streets. (a) Prior to the start of construction the Board of Commissioners may require a maintenance bond to ensure that certain roads that will serve as an entrance for construction traffic through existing sections of a subdivision are restored to the condition existing at the time of construction in the new section or new subdivision was started. If said entrance road or street has 60 percent of the principal structures completed then no maintenance bond for existing roads and streets shall be required. The Board of Commissioners shall also consider the age of the existing road or street in determining the need for a maintenance bond. The amount of the performance bonds shall be based on the "Bond Fee Schedule" provided by the Community Development Department. (b) Said maintenance bond shall cover the time period beginning at the date of issuance of the land disturbing activity (LDA) permit and ending concurrently with maintenance bond for new roads and streets. The maintenance bond shall only be released by the County engineer after completion of necessary repairs. (2) Maintenance bond for new streets. (a) A maintenance bond is required in order to record the final plat for a major subdivision. The amount of the performance bonds shall be based on the "Bond Fee Schedule" provided by the Community Development Department. (b) Said maintenance bond shall cover the time period beginning at the date of acceptance of the roads or streets and ending after 60 percent of the buildings in the subdivision have been completed or two (2) years (whichever is shorter). The maintenance bond shall only be released by the Troup County Engineer. (c) The subdivider or his agent, prior to recording the plat and after final plat approval by the Board of Commissioners, shall present the required maintenance bond. (d) The subdivider or his agent shall maintain the required improvements that exist in or in any way affect the dedicated rightsof-way. Said maintenance shall consist of, but not be limited to the following: • Repair of any areas of pavement or curb failure. • Correcting any erosion. • Removal of any sedimentation that occurs within the right-of-way. • Cleaning any drainage structures. (e) The Troup County Roads and Engineering department inspector shall inspect the required improvements within the last 90 days of the bond period and shall present to the subdivider or his agent a list of needed repairs. If inspection is not performed within the prescribed 90-day period the bond shall be released. The subdivider or his agent shall complete the listed repairs prior to the end of the bond period. If the repairs are not satisfactorily completed at the end of the bond period, an additional one (1)-year maintenance bond will be required. If no repairs are needed, the County shall release the maintenance bond. (3) Performance bonds. For asphalt-wearing course: A performance guarantee such as a performance bond (signed by a firm licensed and insured as a bonding agency under Georgia Laws, furnishing written documentation for approval by the Board of Commissioners); or an irrevocable letter of credit or escrow agreement; in a form acceptable to the County and payable to the County, shall be required prior to recording the final plat. The purpose of the bond is to cover the cost of installing the asphalt-wearing course. The bond shall not be released by Troup County until the wearing course has been installed. In no case shall the asphalt-wearing course be installed less than one (1) year after recording neither the final plat nor more than the period of the maintenance bond. The amount of the performance bonds shall be based on the "Bond Fee Schedule" provided by the Community Development Department. (Ord. No. 2025-03, 6-3-2025) [Sec. 14.10]. Variances. (1) Hardship. Where, due to unusual circumstances, the strict compliance with these regulations may result in excessive hardship or practical difficulties, certain variances may be authorized by the Board of Zoning Appeals and Planning Commission, provided substantial justice is done, the public interest secured and the variance will not nullify the intent or purpose of the Comprehensive Plan, the Zoning Ordinance or these regulations. (2) Conditions. In granting variances and modifications, the Community Development Director may recommend, and the Board of Zoning Appeals and Planning Commission and the Board of Commissioners may require such conditions as will secure substantially the objectives of the standards or requirements so varied and modified. (Ord. No. 2025-03, 6-3-2025) [Sec. 14.11.] Legal status. The Troup County Subdivision Regulations contain the subdivision requirements for the unincorporated area of Troup County. Provisions of these requirements are considered minimum requirements for the promotion of public safety, health, and general welfare. (1) These regulations are not intended to interfere with or annul any easement, covenant or other agreement between parties. However, where these regulations impose a greater restriction upon the use of the property or require greater space than is imposed by other regulations or by private easements, covenants, or agreements, the provisions of these regulations shall govern. (2) Conflicting regulations. All resolutions and parts of any resolution, regulation, or ordinance passed by the Board of Commissioners of Troup County, Georgia, in conflict herewith are hereby repealed. (3) Validity. Should any part, section, or provision of these regulations be declared invalid or unconstitutional, such decision shall not affect the validity of any remaining portion of these regulations. ## History (Ord. No. 2025-03, 6-3-2025)