Skip to content
Georgia Commons
Menu

Troup County · Zoning Ordinance

Appendix C - DEVELOPMENT AND PERMITTING / Article 16 - SOLAR ENERGY SYSTEMS (SES)

Sec. 16.3. Requirements for rooftop solar energy systems.

About this text

  • As published by Municode, current through 2026-06-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. Solar Access. Consistent with O.C.G.A. § 44- 9-20 et seq., a property owner may obtain a solar easement from another property owner for the

purpose of ensuring the Rooftop SES adequate exposure to sunlight.

b. Tree Removal. The removal of trees or natural vegetation for a Rooftop SES shall be avoided to the extent reasonably practicable and shall comply with the requirements of the UDO.

c. Height. A Rooftop SES shall be given an equivalent exemption, if any, to the applicable zoning district's height restrictions for roofmounted mechanical devices or equipment, except a Rooftop SES mounted on a sloped roof shall not vertically exceed the highest point of the roof to which it is attached.

History

The history line the source prints at the end of the section.

(Ord. No. 2025-03, 6-3-2025)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:troup-county/zoning/16.3@2026-06-16-b41171e17a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Troup County Zoning Ordinance, Sec. 16.3. Requirements for rooftop solar energy systems | Georgia Commons