Troup County · Zoning Ordinance
Appendix C - DEVELOPMENT AND PERMITTING / Article 16 - SOLAR ENERGY SYSTEMS (SES)
Sec. 16.3. Requirements for rooftop solar energy systems.
About this text
- As published by Municode, current through 2026-06-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
a. Solar Access. Consistent with O.C.G.A. § 44- 9-20 et seq., a property owner may obtain a solar easement from another property owner for the
purpose of ensuring the Rooftop SES adequate exposure to sunlight.
b. Tree Removal. The removal of trees or natural vegetation for a Rooftop SES shall be avoided to the extent reasonably practicable and shall comply with the requirements of the UDO.
c. Height. A Rooftop SES shall be given an equivalent exemption, if any, to the applicable zoning district's height restrictions for roofmounted mechanical devices or equipment, except a Rooftop SES mounted on a sloped roof shall not vertically exceed the highest point of the roof to which it is attached.
History
(Ord. No. 2025-03, 6-3-2025)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.