Troup County · Zoning Ordinance
Appendix B - LAND USE AND ZONING / Article III - SPECIAL ZONING DISTRICTS
Sec. 3.3. PUD, planned unit development overlay zoning district.
About this text
- As published by Municode, current through 2026-06-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(1) Purpose. The objective of this zone is to establish procedures and standards for implementing comprehensively planned projects with environmental, topographical, or other similarly site-constrained properties. The existing Zoning Map and underlying zoning regulations governing all properties within the Planned Unit Development special zoning district shall remain in full force and effect. The regulations contained within this section shall be overlaid upon, and shall be imposed in addition to, said existing zoning regulations. Except where it is otherwise explicitly provided, whenever the following overlay regulations are at variance with said existing underlying zoning regulations, the regulations of this section shall apply. The specific purposes of the zone are:
(a) To encourage the efficient use of land by:
locating employment, educational and retail uses convenient to residential areas;
reducing reliance on automobile use and encouraging pedestrian and other nonvehicular circulations systems; retaining and providing usable open space and
passive and active recreation areas close to employment and residential population; and providing for the development of comprehensive non-vehicular circulation networks, separated from vehicular roadways, which constitute a system of
linkages among residential areas, open spaces, recreational areas, educational, commercial and employment areas, and
public facilities;
(b) To provide a superior natural environment by the preservation of trees, natural topographic geologic features, wetlands, watercourses, and open space, and;
(c) To allow development only in a staged or phased fashion to ensure the adequate
provision of public facilities and the concurrent implementation of community
(2) Size, Location, and Development Requirements.
(a) The PUD zoning classification and accompanying development plans may be approved upon findings that the application is proper for the comprehensive and systemic development of the County, is capable of accomplishing the purposes of this overlay zoning district, is an internally and
externally compatible form of development and is consistent with any applicable planning and land use policies of the
County. In order to enable the County to evaluate the conformance with the
standards contained herein, specific sets of plans shall be submitted in accordance with subsection (7) herein. The County is authorized to approve said plan or plans if such plans are found sufficient to
accomplish the above purposes in compliance with the standards and requirements of this overlay zoning district.
(b) Minimum Area. No land shall be classified in the PUD zone unless it contains a minimum of 100 acres. Parcels or tracts
less than the minimum acreage may be permitted if they are contiguous to an existing PUD zoned area and may be harmoniously integrated into the PUD area, consistent with the objectives and purposes of this zoning district.
(c) Location. Such land shall be located adjacent to and readily accessible from
existing or planned roadways, sufficient to carry the increased capacity of the
development, and are in an approved construction program. It is intended that adequate access be available to such
sites so that traffic does not have an adverse impact on the surrounding area or cause internal circulation or safety problems. To this end, it is required that any PUD constructed in Troup County
have, at a minimum, two (2) entrances and exits, preferably located along collector or arterial road and street systems.
(3) Signage. Signs shall be permitted in accordance with the regulations applicable to the underlying zoning districts and in accordance with the specifications and standards established in the final site plan, as approved by the Troup County Engineer and Community Development Director. In addition to the signage allowed by the underlying zoning districts, the following additional signage may be permitted:
(a) Primary monuments for the overall development at each primary entrance to the development shall not exceed 64 square feet in surface area and 20 feet in height. These signs shall not be located in the right-of-way of any road, nor shall they obstruct the view of oncoming traffic from any direction.
(b) Secondary monuments for specific phases of the development and for internal
separation of uses within the development shall not exceed 24 square feet in area and four (4) feet in height.
(4) Connectivity. Parcels shall not be zoned PUD unless configured to connect to adjacent roads and streets (grid pattern) and promote the overall connectivity of pedestrians and vehicles within the development.
(5) Traditional Neighborhood Development Principles. Land developed in the PUD zone should be developed in a manner consistent with the principles of traditional neighborhood developments, which emulate the historic pattern of development in the County and will generally be more compatible with existing developed areas of the County. These principles are listed below:
(a) Walkability: Most daily needs can be satisfied within a five (5) to 10-minute walk of home and work (quarter- to
half-mile radius). Pedestrian-friendly road and street design includes buildings close to the road or street, front porches,
continuous tree cover, on-street parking where appropriate, hidden parking lots,
garages relegated to a rear lane or alley, and narrow, slow-speed vehicular
trajectories.
(b) Connectivity: An interconnected road or street grid network disperses traffic and increases walkability by allowing most
roads and streets to be narrow. A highquality pedestrian network and public realm make walking a comfortable, pleasant, and engaging experience.
(c) Diverse Housing: A range of architectural types, sizes, and prices, preferably
interspersed but minimally located in close proximity.
(d) High-Quality Architecture and Urban Design: Emphasis on aesthetics, human comfort, and creating a sense of place and special placement of civic buildings and sites within the community.
Architectural styles and exteriors shall vary and provide an aesthetically pleasing facade to the public road or street.
(e) Increased Density: More buildings, residences, shops, and services closer together, to encourage walking and to enable a more efficient use of resources and time.
(f) Smart Transportation: A transportation network connecting neighborhoods, business districts, cities, and towns together.
Pedestrian-friendly design encourages a greater use of walking, bicycles, carts, and scooters as daily transportation.
(g) Sustainable: Minimal environmental impact of development and its operations. It has less use of finite land and fuel resources and more local production.
(h) Quality of Life: Taken together, all of the above contribute to an improved quality
of life for community residents and for the human community as a whole.
(6) Density and Intensity of Development.
(a) Residential. The total number of dwelling units and the corresponding density, as well as the approximate location of
such units, shall be established at the time of concept plan approval pursuant to subsection (15) provided that the approximate location of specific units may be modified after approval of the plan if such modification does not affect the total density of the development and does not affect the total number of units of a particular type by more than 15
percent. Any modifications that meet the density and type requirements may be
approved by the Community Development Director upon receipt of a revised plat. Any modifications that exceed the
density and type requirements shall be resubmitted to the Board of Zoning Appeals and Planning Commission for approval. The Community Development Director shall have 15 business days to review any modified plans.
(b) Lot size. Supporting commercial facilities and use facilities may be authorized up
to 100 percent lot coverage, provided a parking plan identifying parking alternaAPPENDIX B—LAND USE AND ZONING § 3.3 tives in the immediate vicinity of the
building, acceptable to the Board of Zoning Appeals and Planning Commission, is
developed for the proposed building.
Modifications may be made to the landscape plan if the modifications do not alter the intent of this ordinance and enhance the project as determined by the Community Development Director and
approved by the Board of Zoning Appeals and Planning Commission.
(7) Minimum Open space, landscaping, and amenity requirements.
(a) The amount of open space, including designated parks, public and private open space, active and passive recreational
areas, required for the residential portion of a mixed/multi-use development shall not be less than 25 percent of the net acreage shown for residential use.
The minimum open space requirement, which shall include designated parks, private open space, active and passive recreational areas, for the commercial portion of a mixed/multi use development shall be 10 percent or less of the total net acreage devoted to commercial
uses, except that comparable amenities and/or facilities may be provided in lieu of green area if the Board of Zoning
Appeals and Planning Commission determines that such amenities or facilities are sufficient to accomplish the purposes of the zone, and would be more
beneficial to the proposed development than strict adherence to the specific open space requirement.
(b) All recreation areas, facilities, and amenities, and all open space and landscaped areas, shall be reflected on the application for PUD zone at the concept plan approval stage, approved by the Board of Zoning Appeals and Planning Commission. With respect to such areas, facilities, and amenities, the concept plan or accompanying documents shall reflect:
(i) That such areas, facilities, or amenities shall not be constructed, converted, or
used for any purposes other than reflected and designated on the approved
preliminary plan unless said plan is amended by prior written consent of the Board of Zoning Appeals and Planning Commission.
(ii) A staging or construction timetable specifying the construction of all
recreational areas, facilities, and amenities. The staging or construction timetable may be related to the number of
residential units under construction or completed, population levels, or other appropriate standards. Amendments to the timetable may be made after approval by the Board of Zoning Appeals and
Planning Commission. The adherence to the performance of such timetable may, at the discretion of the Board of Commissioners, be secured by the withholding and suspension of all permits for any
project lying within the designated PUD zone.
(iii) Copies of proposed supporting covenants to be filed among the land records prior to the issuance of building permits, which shall enumerate the property owner's
and all successors' obligations for perpetual maintenance of all common areas, green space, recreation areas, facilities and amenities, and all common landscaped areas.
(8) Public Facilities and Utilities. Roads must conform to standards set and adopted by the County as defined in [appendix C] Article 14 of this UDO and as approved on the preliminary plan. In the event that proposed roads are to be narrower than County specifications or require other changes in order to meet the objectives of the PUD ordinance, the change in conformance to [appendix C] Article 14 may be approved by the County engineer during the preliminary plat approval stage. Each development must have on-site water and sewer capabilities. All developers are required to have sewer systems operated and maintained by a governmental body qualified to do so. All utilities shall be underground for PUD developments. Utility and road departments are urged to work with the developer to place utilities, sidewalks, and trees in a place that is functional for all and that allows for street trees.
(9) Parking Requirements. In addition to any other requirements of this section, off-street parking shall be provided as follows:
(a) Parking spaces shall be determined by the off-street parking regulations of this ordinance. The Board of Zoning Appeals
and Planning Commission may reduce or increase the number of spaces required for any use allowed in the PUD zone when such reduction or increase will meet the purposes of the PUD zone.
(b) Street Trees. Developers are encouraged to provide for street trees that, at some point in the future, may provide a canopy of trees lining the roads or streets and neighborhoods of the mixed/multi-use
districts. All mixed-use developments are required to submit a landscape plan to be approved by the County arborist. In order to ensure that development options are
as flexible as possible, the landscape plan may be amended as needed to properly serve the development. However, the approved preliminary plat and
landscape plan shall be what is required to be built. The preliminary may be
modified until construction drawings are submitted to the County engineer for
approval.
(10) Application and Processing Procedures.
All planned unit developments are subject to Troup County Subdivision Regulations. A traffic impact study for the proposed site is required at the time of zoning of the property and concept plan approval. Procedures for governing the application for the PUD zone and approvals necessary to seek building permits shall be subject to the following multiple-step process:
(a) Concept plan approval does not ensure future approval of the preliminary plan
or an indication that the project will be approved in future phases of review.
(b) An applicant shall file, together with the prescribed application fee, a concept plan and rezoning application. The concept
plan shall include at a minimum the following:
(i) The boundaries of the entire tract or parcel.
(ii) The location size, capacity of roads located on all adjacent lands.
(iii) Generalized location of existing and proposed external roads and adjacent
land use and development.
(iv) Generalized location and description of various internal proposed land use
components, including information as to proposed densities and intensities, proposed size and heights of development.
(v) Generalized location, description, and timing of proposed roads, proposed
dedicated public lands, and perimeter setback or buffer areas.
(vi) Proposed phasing or staging plan of development, public facilities, and
information pertaining to the provision of public facilities as required by the County.
(vii) Generalized areas of woodlands, streams, watercourses, and other areas intended
for natural preservation.
(viii) An illustrative plan providing for the physical layout of the entire development, including all roads, streets, lots, parcels, parks, and open spaces.
(11) Proposals. During the concept plan approval phase, the Development Review Committee, the Planning Commission, and the developer will engage in meetings and planning sessions before submitting proposals for consideration by the Board of Zoning Appeals and the Planning Commission.
(12) Concept Plan Findings. The Board of Zoning Appeals and Planning Commission may approve the accompanying concept plan upon finding that:
(a) The application meets or accomplishes the purposes, objectives, and minimum
standards and requirements of the zone;
and
(b) The application and concept plan will be internally and externally compatible and harmonious with existing and planned
uses in the PUD zoned areas and adjacent areas.
(13) A preliminary development plan shall be filed for approval, rejection, or modification by the Board of Zoning Appeals and Planning Commission of all or portions of the area zoned PUD and reflected within the approved concept plan, together with the required filing fee. The preliminary development plan shall be scaled at one (1) inch equals 50 feet and shall contain, at a minimum, the following:
(a) Boundary survey and identification plat or survey plat.
(b) The use(s) of all buildings and structures within the preliminary development plan
area, as well as existing uses of adjacent property external to the PUD zoned area.
(c) The location, height, and approximate dimensions and conceptual architectural
elevations of all buildings and structures, and the setbacks and densities and/or
square footage thereof.
(d) The location of points of access to the site and all public and private roads,
pedestrian and bike paths, in accordance with the applicable thoroughfare design
standards.
(e) The location and setbacks of all parking areas.
(f) Existing topography, including:
(i) Contour intervals of not more than two
(2) feet;
(ii) 100-year floodplains and floodways, including base flood elevations.
(iii) Other natural features, such as rock outcroppings and scenic views;
(g) Historic buildings, structures, or areas.
(h) Drainage easements.
(i) All landscaped areas, proposed conceptual screen planting, open spaces, recreation, and amenity areas.
(j) Proposed phasing or staging plan of development and information relating to such plan's consistency with the provision of public facilities.
(k) A proposed (draft) covenant or other form of agreement indicating how the
area will be included in any homeowners association or other legal organization, and how any open space, community
space, or amenities located within the area subject to review will be perpetually maintained.
(l) Five (5) copies of the preliminary plan/ plat are required for submittal to the
review process, 24 inches by 36 inches or of a size acceptable to the Community
Development Director. All plats and supporting information shall also be submitted in digital format as may be required by the Community Development Director.
(m) Two (2) drawings that inventory all wetlands, all watercourses and impoundments, and floodplain limits;
(n) Two (2) copies of the stormwater management plan;
(o) A typical section view for a typical utility plan;
(p) A transportation plan showing the interconnection to the residential and commercial areas and their relationship to all adjoining properties;
(q) Required fees;
(r) Project narrative to include description of the type of project and who it will
serve, developer information, contractor information, engineer information, contact information, anticipated start dates,
completion dates, phasing description (if applicable), impact statement describing projects effects on surrounding transportation including traffic counts and flows from proposed project and existing counts, a narrative description of how traffic will be managed and controlled (and calmed)
as appropriate for the development (the traffic impact study may be substituted for this part of the narrative) description of greenspace and public/community space proposed for the project; and
(s) Application must be signed by the owner, developer, and engineer or land surveyor (licensed in Georgia with stamp affixed).
(14) Preliminary Plan Findings. The PUD preliminary plan submittal may be approved upon finding that:
(a) The plan is substantially in accord with the approved concept plan; and
(b) The plan meets or accomplishes the purposes, objectives, and minimum standards and requirements of the zone;
and
(c) The plan will be internally and externally compatible and harmonious with existing and planned uses in the PUD zoned areas and adjacent areas; and
(d) The existing or planned public facilities are adequate to serve the proposed
development contained in the plan; and
(e) The development staging or phasing program is adequate in relation to the provision of public facilities and private amenities to service the proposed development.
(15) Final Site Plan Review. Following rezoning and approval of a preliminary development plan, approval of construction drawings to include two (2) copies of the erosion and sedimentation control plan and full utility plan; construction of roads and any other required documentation an applicant shall be submitted to Troup County Roads and Engineering Department for review and approval to the Board of Commissioners a final site plan for approval for dedication of the roads, which shall be in accord with the approved preliminary development plan and shall include the following:
(a) All information required pursuant to the requirements of the preliminary plan;
(b) Proposed covenants, suitable for filing in the deed records of Troup County, which
shall indicate in specific language that the property is restricted in its use and/or development standards to the preliminary development plan and any accompanying
or qualifying text material submitted with such plan, such plan shall be approved by the Troup County attorney at the time of final site plan review.
Additional requirements for the covenants are as follows:
(i) Building/structure setbacks and lot coverage;
(ii) The location and type of accessory buildings and structures;
(iii) Type and nature of accessory uses; and (iv) The appearance of buildings and
structures, configuration of building elements, and type of building materials.
Provided, however, no such rules, regulations, and standards shall exceed any maximum development standard or be
less than any minimum development standard or permit any use otherwise prohibited in the PUD zone. All owners of property subject to the final site plan and their assigns shall be notified (by the developer) of such rules, regulations, and standards at the time of taking title to property located within the final site
plan area.
(16) The Board of Commissioners shall approve a final site plan upon consideration, determination, and the powers set forth in this article. The Board of Commissioners shall, as a condition of approval, require the posting of all necessary bonds or other security instruments and the recording of covenants.
(17) No person, firm, or corporation may violate any requirement of this article, including but not limited to deviation from the requirements of the final site plan, and any such violation shall be enforceable by the County and subject to such enforcement and penalties provided by the Zoning Ordinance.
(18) The homeowner's association or developer shall commission an architect as a method of ensuring compliance with the architectural code.
Said architect shall be retained by the developer and/or homeowner's association until such time as the last lot in the PUD zone at issue is developed.
History
(Ord. No. 2025-03, 6-3-2025)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.