--- title: Troup County Zoning Ordinance, Sec. 5.16. Sprinkler system certification collection: local-codes id: local-code:troup-county/zoning/5.16 cite_as: Troup County, Ga., Zoning Ordinance ยง 5.16 canonical_url: https://georgiacommons.org/code/local/troup-county/zoning/5.16 md_url: https://georgiacommons.org/code/local/troup-county/zoning/5.16.md text_url: https://georgiacommons.org/code/local/troup-county/zoning/5.16/text source_url: https://library.municode.com/ga/troup_county/codes/code_of_ordinances date: 2026-06-16 status: active jurisdiction: county:troup jurisdiction_name: Troup County county_fips: "13285" corpus_version: local-codes-troup-county-7a9c065e873c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/troup-county/zoning/~appendix-c/~article-5.md previous: https://georgiacommons.org/code/local/troup-county/zoning/5.15.md next: https://georgiacommons.org/code/local/troup-county/zoning/5.17.md index: https://georgiacommons.org/code/local/troup-county.md branch: zoning edition: As published by Municode, current through 2026-06-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:troup-county/zoning/5.16@2026-06-16-c80508fbea --- # Troup County Zoning Ordinance, Sec. 5.16. Sprinkler system certification > As published by Municode, current through 2026-06-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - DEVELOPMENT AND PERMITTING / Article 5 - FIRE PREVENTION AND PROTECTION (1) A representative of the fire marshal's office shall be present to witness a flow test on all sprinkler systems. (2) The following documents must be provided to the fire marshal's office at the time of the final inspection: (a) Sprinkler certification that the sprinkler system is installed according to NFPA guidelines and the manufacturer's instructions. (b) Contractor's material and test certification for aboveground piping (signed by certificate of competency holder). (c) Contractor's material and test certification for underground piping (signed by approved GA [Georgia] licensed contractor). (d) Fire sprinkler piping welder certification (current license holder). (e) A fire pump installation acceptance testing data and flow graph (if a fire pump is installed). ## History (Ord. No. 2025-03, 6-3-2025)