Skip to content
Georgia Commons
Menu

Troup County · Zoning Ordinance

Appendix C - DEVELOPMENT AND PERMITTING / Article 6 - ROADS, STREETS, AND OTHER PUBLIC PLACES

Sec. 6.3. Utility facility encroachments and road crossings.

About this text

  • As published by Municode, current through 2026-06-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(1) Permit.

(a) Required; strict construction, work limited.

(i) It shall be unlawful for any person to cause any utility facility encroachment in, or any crossing of, a public road maintained by the County

outside of the corporate limits of any municipality in the County, without a permit therefor from the Board of Commissioners.

(ii) The permit is to be strictly construed, and no work other than that specifically described therein is authorized.

(iii) The permit shall have a fee as provided in the established fee schedule.

(b) Definition of qualified applicant. Applications for permits under the rules of this section will be accepted only from a

political entity, an individual, partnership or corporation, or other body recognized by law as owning all or the

major interest in the property abutting the road right-of-way, or the proposed facility, which will be principally affected by the performance of the work covered by the permit or by the lessee of property of business. Such qualified persons will be referred to in this article as the "applicant."

(c) Information on application; filing. Applications for permits shall be filed with the Board of Commissioners and shall contain

the following information:

(i) The name and a mailing address of the owner or lessee;

(ii) A description of the type of work intended and submission of a plan with three (3) copies. The plan should show the centerline and the rightof-way, indicating width, and also the width of pavement, the location

of existing driveways and drainage structures, elevation and/or sections when necessary. It should also show the boundaries of the

contemplated work. When the grading is proposed, the drainage plan shall be shown.

(iii) Give the County, state route number, and distance from geographical point such as intersecting highways, municipal corporate limits, or County highways.

(d) Scope; effect; transfer; damage liability.

The provisions of any permit granted under the rules and regulations of this article shall be construed as regulatory and not as contractual. No interest or right of an applicant shall be transferred to another except by written consent of the Board of Commissioners. No inherent or retained right or privilege belonging to any abutting property owner is affected, interfered with or abridged

through or because of this article or any permit issued under this article, nor is the County responsible for any damage claim which may arise as between the applicant and any property owner concerning such right-of-way or its occupancy or use. The decision of the chairman of the

Board of Commissioners (or the chairman's designated agent) shall be final and conclusive with respect to any of the conditions, terms, stipulations and provisions of the permit. This shall not foreclose the applicant's right of appeal to the Superior Court of Troup County.

(e) Revocation. Any permit granted by the Board of Commissioners shall be revocable at the pleasure of the board. If any facilities after construction become dangerous, unsafe or a nuisance to the traveling public using the highways, or if such facilities should create any unreasonable interference with the proper use of the highways by the traveling public, or

in case it becomes necessary to use all of the right-of-way to widen the existing roadway or to construct service roads or to make any other revisions in location, alignment or grade of the roadway, making the approved entrance plan impractical, hazardous, or otherwise objectionable, the permit for the same may be revoked.

However, in that event, there shall be given 10 days' written notice prior to such revocation.

(2) Allocation of costs.

(a) The entire cost of installing, maintaining, repairing, operating, or using the pole line, buried cable, pipeline, or miscellaneous facility; performing miscellaneous operations and any other expense

whatsoever incidental to the facilities or operations authorized by the permit shall be paid by the applicant.

(b) The applicant shall, in addition to compliance with subsection (a) of this section, reimburse the County for any reasonable

and necessary expense that it may incur in connection with the facilities or operations authorized by the permit. The reimbursement to the County shall be

made by the applicant within 30 days after receiving a statement from the chairman of the Board of Commissioners.

(c) The applicant upon notification in writing by the chairman of the Board of Commissioners, shall pay a reasonable

market price for any materials removed from the right-of-way or destroyed as a result of operations authorized by the permit.

(3) Installation to comply with rules. The utility covered hereby shall be installed in accordance with the plan and subject to the printed rules and regulations for the control and protection of County-maintained roads and rightsof-way on file in the office of the Board of Commissioners, which rules and regulations are

made a part of this article by reference thereto, and particularly to the applicable provisions of such rules and regulations shown on the permit and any special requirements set forth in this section. The applicant agrees to comply with and be bound by such rules and regulations.

(4) Protection of public from injury, and highway from damage.

(a) The applicant shall employee all methods in performing the operations authorized by the permit which the chairman of the Board of Commissioners or designated agent may require in order to properly protect the public from injury and the highway from damage.

(b) During the initial installation or construction of the facilities authorized by the permit, or during any future repair,

removal or relocation thereof, or during any miscellaneous operations, the applicant shall at all times maintain such flagmen, signs, lights, flares, barricades, and other safety devices as the chairman may reasonably deem necessary to properly protect traffic upon the highway, and to warn and safeguard the

public against injury or damage. The applicant shall maintain a watchman, as required, to maintain such signs, flares, barricades and other safety devices during non-work hours, and shall upon request furnish the County road superintendent the telephone number and/or address of such watchman.

(c) The applicant shall so conduct the operations that there will be a minimum of interference with or interruption of traffic upon and along the highway. Except in emergencies there shall be no interference with or interruption of traffic upon and along the road or highway until a

plan for the satisfactory handling of traffic has been worked out and approved by the chairman of the Board of Commissioners or the County Road superintendent as soon as practicable.

(d) All roads should be bored where feasibly possible (dry bored).

(e) Any supervision or control exercised by the County Road superintendent shall in no way relieve the applicant of any duty or responsibility to the general public, nor shall such supervision or control relieve the applicant from any liability for loss, damage or injury to persons or property.

(5) Regrassing; restoration of surface.

(a) Any area where grass is destroyed shall be regrassed.

(b) All applicants shall comply with County specifications for restoration of the surface.

All cuts across or into County paved roads shall be:

(i) Tamped by pneumatic tamp.

(ii) Filled with concrete as required.

(iii) Finished with asphalt as required.

(c) Final inspection and approval shall be by either the County manager or the County Road superintendent.

History

The history line the source prints at the end of the section.

(Ord. No. 2025-03, 6-3-2025)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:troup-county/zoning/6.3@2026-06-16-101dd635cb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Troup County Zoning Ordinance, Sec. 6.3. Utility facility encroachments and road crossings | Georgia Commons