(1) Installation of plant materials. (a) Plant materials, as required by the provisions of this article, shall be installed prior to issuance of a Certificate of Occupancy. The Community Development Director may allow one (1) planting season in a 12-month period in which the installation of plant materials shall be completed, subject to the performance security requirements, below. (b) Performance surety. In such cases as when planting stock availability is low or weather conditions are not appropriate for planting new trees, the project owner may postpone planting for up to six (6) months; provided that performance security is posted with Troup County in accordance with the following criteria: (i) Security shall be in cash held in escrow or an irrevocable letter of credit submitted to the Community Development Director, with the appropriate documentation. (ii) Security shall be provided in an amount equal to 110 percent of the cost of materials, installation and 2-year guarantee as demonstrated by a signed contract between the owner and a qualified landscape contractor, and as approved by the Community Development Director. (c) An inspection shall be made by the Community Development Director of all tree plantings to assure compliance with plan requirements prior to release of the performance security. The performance security will be drawn upon by Troup County at the time of expiration if the planting requirements have not been fulfilled, or if the owner has not requested an extension. One (1) six (6)-month (6) extension may be permitted with documented justification acceptable to the Community Development Director. Any inspections performed after the final inspection (for project release) are subject to re-inspection fee schedules. (d) Maintenance bond. (i) Prior to approval of a final subdivision plat or issuance of a certificate of occupancy, or prior to release of a performance surety provided under this section (whichever last occurs), a maintenance bond, letter of credit or escrow account in a form acceptable to the Community Development Director is required for all plant materials installed as a result of the requirements of this article. The developer shall be responsible for maintenance of all such plant materials for two (2) years from the date of acceptance of the maintenance bond. (ii) The value of the maintenance bond shall be equal to 25 percent of the actual cost of installation of the plant materials. The cost of installation shall be evidenced by copies of contractor agreements or actual invoices paid, or as otherwise determined by the Community Development Director in accordance with generally established costs for the industry. (2) Maintenance of required plant materials. (a) The owner, tenant and their agent, if any, and their successors and assigns shall be jointly and severally responsible for the maintenance in good condition of the plant materials used to meet the minimum landscaping and buffer requirements of this article. This responsibility is in addition to and survives the release of any maintenance bond provided for the property by the developer. (b) Plants that are diseased, unsurvivably damaged or are dead shall be removed and replaced with a plant of the same species, variety or cultivar, as acceptable to the Community Development Director. (c) Other landscape materials shall be maintained in proper repair and shall be kept clear of refuse and debris. (d) Existing buffer plantings, street tree plantings, or other landscaping installed under previous codes may be thinned or removed if any plant materials are found to be in a dangerous situation or horticulturally distressed, diseased, or dying because of the inherent site situations or incorrect spacing as long as the provisions of the applicable code sections contained herein are met and maintained.