A buffer meeting or exceeding the following widths shall be required between any single family, multi-family, manufactured home park and nonresidential use along a side or rear lot line that abuts a less intense land use, as follows: Table 9.1: Situations Where Buffer Required BUFFERS AND SETBACKS Commercial Zoning Single or Two-Family Dwelling uses Multi-Family Dwellings/Manufactured Home Park uses Drain field encroachment within buffer— setback requirements LC (to include CRV Parks) 30 feet 25 feet 0 HC 50 feet 25 feet 25 feet LI 100 feet 25 feet 50 feet HI 200 feet 25 feet 50 feet Multi-Family/ Manufactured Home Parks 30 feet 0 0 Public Institution Will be determined by staff Sanitary/Landfill 200 feet from property line; 500 feet from occupied dwelling and the dwellings' operational private, domestic water supply well. *(4) 200 feet from property line; 500 feet from occupied dwelling and the dwellings' operational private, domestic water supply well. *(4) 50 feet (1) A buffer must be provided between any multi-family residential use and any agricultural zoning district or single-family or two-family use or zoning district; (2) A buffer must be provided between any office, institutional or commercial use and any agricultural zoning district or any single-family, two-family or multi-family use; and (3) A buffer must be provided between any industrial use and any AG, SU-R, SU-VL, UR-VL, or LR zoning district. (4) The five hundred (500) foot buffer may be reduced if the current owner of the dwelling provides written waiver consenting to waste disposal boundary being closer than five hundred (500) feet.