Turin · Zoning Ordinance
Article 10 - SIGNS
10.5
About this text
- As posted on the city's website, retrieved 2026-11-11
Permits and procedures.
A. Unless specifically exempted from obtaining a permit under provisions of this ordinance, no person shall erect, construct, replace, relocate or structurally alter any sign within the Town without first obtaining a sign permit from the Town Clerk. No permit shall be required to repaint or change the lettering of an existing conforming sign, provided that no change of ownership of the entity displaying the message thereon has been made.
A permit is not required for a change limited solely to the copy of an existing changeable copy sign, for example, a change in the normal price or products offered on the premises.
B. A Sign Permit Application and appropriate application fee must be submitted for each sign being considered for approval. A separate sign permit application and associated fee must be submitted for each type of sign located on a project site (i.e., one permit for all monument signs, one permit for wall signs, one permit for directional signs, etc.)
1. Applications for permits shall be made upon forms provided by the Town and shall contain or have attached thereto the following information:
2. Name, address and telephone number of the applicant.
3. Address of building, structure, or lot to which or upon which the sign is to be attached or erected.
4. One accurate drawing showing the position of the sign in relation to nearby buildings or structures, including other signs, driveways, parking areas, and any other limiting site features.
5. One accurate drawing of the plans, specifications and method of construction and attachment of the sign to the building or ground. Such drawings shall include the size of the sign area, overall height of the sign, location of the sign installation and its relation to existing rights-of-way and all driveways, and, if a monument sign, any protective devices or landscaping around the base of the sign.
6. Name, address and telephone numbers of person erecting the sign.
7. Written consent of the owner, manager, leasing agent or lessee of the building or land to which or upon which the sign is to be erected.
8. The location and size of all other signs on the lot upon which the sign is to be erected.
9. The size of the lot on which the sign is to be erected and the length of the street frontage for the street to which the sign is oriented; or, if a wall sign, the overall length of the tenant space where the sign will be located.
10. If the sign is to be lighted, an application for electrical permit meeting all standards of the Town’s electrical code.
11. Such other information as the Town shall require to show full compliance with this and other ordinances of the Town.
C. For signs shared by more than one person or entity, the owner or sign contractor shall secure a permit for the sign structure and the owner shall be responsible for the maintenance of the structure as well as for removal of individual sign panels identifying uses which no longer exist within the building or buildings covered by the shared sign. In addition to the permit required for a shared sign structure, a separate permit shall be required for each panel, which shall be obtained by the owner, his tenant, an authorized agent, or the sign contractor.
D. Fees for permits shall be as fixed from time to time by the Council.
E. Upon the filing of an application for a permit and the payment of all necessary fees, the Town Clerk shall examine all plans and specifications submitted and the premises upon which the sign is proposed to be erected. Such review shall be completed within thirty (30) days of submission of a completed sign application. If it appears from review of the permit application and the site that the proposed sign is in compliance with the requirements of this ordinance and all other ordinances and laws of the Town, the Town Clerk shall issue a permit no later than thirty (30) days from receipt of the completed application.
F. For those signs containing electrical components, the Applicant must secure appropriate Electrical Permits from the Town’s Building Department and call for an inspection prior to illuminating the sign.
G. Denial of permit. The Town shall deny permits to applicants who submit applications for signs that do not comply with the provisions of this ordinance, are incomplete, or contain any false material statements. The Town may deny permits for master sign programs, or amendments to master sign programs, based upon the architectural appearance of the program; such review, however, shall not include the content of the message(s) conveyed in the master sign program. Violation of any provision of this ordinance will be grounds for terminating a permit granted by the Town for the erection of a sign. Should it be determined that a sign permit was issued pursuant to an incomplete application or an application containing a false material statement, or that a permit has been erroneously issued in violation of this ordinance, the Town Clerk shall revoke the permit.
Should the Town Clerk deny a permit, the reasons for denial shall be stated in writing and mailed by certified mail, return receipt requested, to the address on the permit application on or before thirty (30) days after the Town received the application. Alternatively, the Town may personally serve the sign applicant with a copy of the written notice of denial within thirty (30) days after the Town’s receipt of the application. Any application denied and later resubmitted shall be deemed to have been submitted on the date of resubmission, instead of the date of the original submission.
No permit shall be denied or revoked, except for due cause as hereinafter defined, and after the applicant is given ten (10) days written notice containing a statement of the reasons for the proposed denial of the permit application or the revocation of a permit.
“Due cause” is the violation of any provision of this ordinance, or other applicable ordinances, state or federal law, or the submission of an incomplete application or an application containing false material statements.
H. Appeals. An individual whose permit application has been denied or a permittee whose permit has been revoked may appeal the decision to the Council, provided such appellant files a written notice of appeal with the Town Clerk within ten (10) business days of the Town Clerk’s notice. Such appeal shall be considered by the Council at the next Town Council meeting held after the Town’s receipt of the written notice of appeal, provided that such notice of appeal is received a minimum of five (5) business days before the next meeting. Appeal notices received within five (5) days of a scheduled Town Council meeting shall be heard at the next available meeting more than five (5) days following receipt of appeal. The Council shall issue a written decision to the applicant no later than thirty (30) days following the close of the appeal hearing. Decisions of the Council to affirm the decision of the Town Clerk or to overrule the decision of the Town Clerk and grant or continue the permit for which appeal is taken shall be reduced to writing and served upon the applicant in the same manner as the original notice to deny or notice of revocation. Such decision shall constitute a final determination by the Town of Turin.
In the event an applicant whose permit has been denied or a permit holder whose permit has been revoked is dissatisfied with the decision of the Council, such applicant or permit holder may appeal such decision via a Petition for Writ of Certiorari to the Superior Court as provided by law.
I. Variances. Each sign shall comply with the provisions of the ordinance, unless a written request is filed and approved to waive this requirement. All variance procedures shall be held in strict conformance with the procedures for variances as set forth in Article XIII, Section 1302 of the Town’s Zoning Ordinance; provided, however, that variances from the regulations of this ordinance shall be limited to the following hardship situations or conditions:
1. Where the proximity of existing signs on adjoining lots causes the subject property to be ineligible, due to spacing requirements, for a sign of the type sought; or
2. Where visibility of a conforming sign from the proposed street and within fifty (50) feet of the proposed sign would be substantially impaired by existing trees, plants, natural features, signs, buildings or structures on a different lot; and
3. Placement of the sign elsewhere on the lot would not remedy the visual obstruction;
4. Such visibility obstruction was not created by the owner of the subject property; and
5. The variance proposed would not create a safety hazard to vehicular traffic or pedestrians as determined by the Town Engineer.
Variances shall be limited to the minimum relief necessary to overcome the hardship.
No variances shall be granted to allow a greater number of signs than would be allowed if the hardship did not exist.
Relief from the application of the provisions of this ordinance by use of variances granted by the Council shall be granted only upon a finding of hardship as previously defined. Hearing on such variances shall be noticed using this same time frames and notice requirements as for variances from zoning decisions.
J. Double permit fees. Any person commencing work on a sign before securing the necessary permit from the Town Clerk shall be subject to double permit fees under the permit fee schedule.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.