A. Pre-Application Procedures. To promote better communication and avoid unnecessary expense in the design of acceptable subdivision proposals, each developer is encouraged to meet with the Planning Commission prior to filing an application for rezoning to the RC Conservation Subdivision District. B. Application Requirements. The application for rezoning to the Conservation Subdivision District shall include a Conceptual Plat as outlined in the Land Development Ordinance for the Town of Turin. In the event any portion of the Land Development Ordinance is inconsistent with this Article, the more stringent regulation shall apply. C. The following additional information shall also be included in the application: 1. Property boundaries; 2. All streams, rivers, lakes, wetlands and other hydrologic features; 3. Topographic contours depicting a maximum interval of 10 feet; 4. All Primary and Secondary Conservation Areas identified by type, as described in Section 14.6.C of this Article; 5. General vegetation characteristics; 6. General soil types; 7. The planned location of Greenspace; 8. Existing roads and structures; and 9. Potential connections with existing greenspace and trails. INTENTIONALLY LEFT BLANK