15.13. Building Permit Required.

About this text

  • As posted on the city's website, retrieved 2026-11-11

A. No building or other structure shall be located, erected, moved, added to, or structurally altered without a building permit issued by the Building Inspector. No building permit shall be issued except in conformity with the provisions of this Ordinance.

B. It shall be unlawful to commence the excavation or filling of any lot for construction of any building until a building permit has been issued for such work.

C. No permit shall be required for any repairs or modernization of any building which does not increase the floor area of such building, providing that no encroachment into any required yard area is built.

D. All applications for building permits shall be accompanied by plans or sketch in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the sizes and locations on the lot of any existing buildings or structures, the shape, size, height, use and location on the lot of the building or structure proposed to be erected or altered, setback distances, any parking spaces, and such other information as may be necessary to provide for the enforcement of the provisions of this Ordinance. If no substantial construction progress has been made within six months of the date of the issuance of the building permit, the permit becomes invalid and a new building permit shall have to be issued.

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:turin/zoning/15.13@2026-11-11-a3f9dc4613

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Turin Zoning Ordinance, 15.13. Building Permit Required | Georgia Commons