--- title: Turin Zoning Ordinance, 8.5. Development Regulations collection: local-codes id: local-code:turin/zoning/8.5 cite_as: Turin, Ga., Zoning Ordinance ยง 8.5 canonical_url: https://georgiacommons.org/code/local/turin/zoning/8.5 md_url: https://georgiacommons.org/code/local/turin/zoning/8.5.md text_url: https://georgiacommons.org/code/local/turin/zoning/8.5/text source_url: https://townofturin.com/docs/Turin-Zoning-Ordinance.pdf date: 2026-11-11 status: active jurisdiction: city:turin jurisdiction_name: Turin place_fips: "1377764" corpus_version: local-codes-turin-e4ba59e87ed6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/turin/zoning/~article-8.md previous: https://georgiacommons.org/code/local/turin/zoning/8.4.md next: https://georgiacommons.org/code/local/turin/zoning/8.6.md index: https://georgiacommons.org/code/local/turin.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:turin/zoning/8.5@2026-11-11-5b41b34869 --- # Turin Zoning Ordinance, 8.5. Development Regulations > As posted on the city's website, retrieved 2026-11-11 Part of: Article 8 - QUALITY CONTROL OVERLAY DISTRICT A. Streetscape. A streetscape plan for all development in the Overlay shall be subject to approval by the Council. Front yard landscaping areas shall be as provided herein along the entire property frontage, except where driveways or other openings may be required. Landscaping shall utilize fences, berms, walls, sidewalks, trees and other such methods subject to approval by the Council. The streetscape plan shall accommodate an undisturbed, natural buffer along the frontage of Highway 16 and Highway 54 as provided herein. All development on Highway 16 and Highway 54 shall maintain a landscaped buffer having a minimum horizontal dimension of 20 feet along all property lines abutting these roadways. B. Underground Utilities. All on site utilities shall be located underground. C. Site Development. Mass grading of a site shall be prohibited and all clearing shall be subject to Sec. 8.5 of this Article. Projects to be developed in phases shall be issued land disturbance permits for only those phases or portions of phases to be built within a subsequent 12-month period. D. Site Inspection. All required silt fence and tree protection fencing shall be installed and inspected before land disturbance commences.