Turner County · Zoning Ordinance
Appendix B - SUBDIVISIONS / Article II - DEFINITIONS
Sec. 2-1. General.
About this text
- As published by Municode, current through 2010-11-02
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
When used in this ordinance, the following words and phrases shall have the meaning given in this section: Terms not herein defined shall have their customary dictionary definitions where not inconsistent with the context. The term "shall" is always mandatory. When not inconsistent with the context, words used in the singular number include the plural, and those used in the plural number include the singular. Words used in the present tense include the future. The Turner County board of commissioners' interpretation shall be final as to the meaning of any definition, statement, requirement, symbol, and/or abbreviation used in connection with these regulations and/or their application.
Abutting property. Any property that is immediately adjacent or contiguous to property proposed to be subdivided or that is located immediately across any road or public right-of-way.
Alleys. A public right-of-way, not intended to be a vehicular arterial or to provide the primary means of access to abutting property, but used for service access to the rear or side properties otherwise abutting a public street.
Applicant. Any person who submits subdivision plans to the county for the purpose of obtaining approval thereof.
Architect. A qualified person registered and currently licensed or otherwise authorized to practice architecture in the State of Georgia.
Building line. A line beyond which no foundation wall or part of the structure of any building shall project with the exception of roof overhang, walkways, and the subsurface projection of footings; provided, however, that such overhang does not exceed six feet and does not encroach upon the adjacent property or right-of-way.
Chairman. The chairman of the Greater Turner Planning Advisory Commission.
Comprehensive plan. The 2025 Greater Turner County Comprehensive Plan, as duly amended, reviewed by the planning commission and/or the Turner County board of commissioners, which may consist of the major thoroughfare plan, general land use plan, street and road classification plan, and other maps, data, and descriptive matter for the physical development of the county or any portions thereof, including any amendments, extensions, or additions thereto as adopted by the planning advisory commission and/or the Turner County board of commissioners.
Consultant. The licensed design or engineering professional or firm hired by the subdivider to oversee all aspects of the subdivision and design process.
County. Turner County, Georgia.
County engineer. A public official appointed by the county board of commissioners who has specialized training in engineering and state certification.
Crosswalk. A right-of-way within a block dedicated to public use for pedestrian use only and so designed as to provide access to adjacent streets or lots.
Cul-de-sac. A street having only one end open for access to another street, the other end being terminated by a turnaround as specified in this ordinance.
Developer. Same as Subdivider.
Development. The act or process of erecting buildings, structures, or of making improvements to property or laying out and dividing land.
Easement. A grant by the owner of land for the use of such land by others, including public usage, for a specific purpose or purposes.
Exempt subdivision. Any subdivision that has approved zoning and has had a plat submitted for approval by the Turner County engineer, the Greater Turner Planning Advisory Commission and the Turner County board of commissioners prior to the adoption of this ordinance, shall be declared an exempt subdivision, and acted upon under the conditions of the ordinances that were in place at the time such plat was submitted.
Floodprone areas. An area identified as having a potential flood hazard pursuant to the Turner County Floodplain Management Ordinance, as amended from time to time.
Guarantee. A maintenance bond, in the amount of 15 percent, required by this ordinance, which guarantees to Turner County, all materials and workmanship of any minimum improvements installed in a subdivision.
Hardship. A situation arising as the result of extraneous or unique circumstances which deprives the developer of the reasonable use of his land if the strict application of the various provisions of this ordinance are applied (See Variance.)
Improvement plan. The second stage of plat or subdivision plan review, as described in section 4-2 of this ordinance. For the purpose of the enforcement of this ordinance, the improvement plan must include the soil erosion and sedimentation control plan and land disturbance permit application.
Landscape architect. A design professional registered and currently licensed or otherwise authorized to practice landscape architecture in the State of Georgia, as defined in O.C.G.A.
§ 43-23-1, providing the services therein defined.
Lot. A parcel of land separated from other portions or parcels by description as shown on a subdivision plat, a survey map recorded in the Turner County superior court clerk's office, or as described by a metes and bounds description found in a deed of record recorded in the clerk's office and which parcel is intended for transfer of ownership or for building development. For the purpose of this ordinance, the term does not include any portion of a dedicated right-of-way.
Lot, corner. A parcel of land at the junction of and fronting on two or more streets.
Lot of record. A lot which is part of a subdivision recorded in the office of the clerk of superior court of Turner County or a parcel described by metes and bounds, the description of which has been so recorded prior to January 20, 2000, the date of adoption of the Turner County zoning ordinance.
Lot width. The distance measured straight between the side lot lines, measured at the intersection of the building line, which shall be parallel to the street right-of-way line.
M.S.L. Mean sea level.
Planning commission. The Greater Turner Planning Advisory Commission.
Performance bond. A legal instrument made payable to Turner County, which a developer may post with Turner County to permit recording of a final plat prior to completion of the required minimum improvements.
Plat. A map, generally of a subdivision, showing the location, boundaries and ownership of individual properties.
1. Plat, preliminary. The first stage of plat or subdivision plan review, as described [in] section 4-1 of this ordinance.
2. Plat, final. The final stage of plat or subdivision plan review, as described in section 4-3 of this ordinance.
Private right-of-way. A portion of land being used or to be used as a street, road, thoroughfare, crosswalk, pipeway, drainage canal, and/or other similar uses and designated by means of right-of-way but not deeded to the governing authority.
Protective covenant. A private contract, existing between the land subdivider or developer and subsequent property owners of a particular defined area, limiting design and usage of similarly situated properties. These instruments are generally publicly recorded with a particular land subdivision, and maintenance and enforcement of the contract is between the private parties.
Public water and sewage systems. A system owned and operated by the City of Ashburn, City of Sycamore, or City of Rebecca. Turner County has no water nor sewage services.
Public right-of-way. A portion of land being used or to be used as a public street, road, thoroughfare, crosswalk, pipeway, drainage canal, and/or other similar uses and designated by means of right-of-way deed to the governing authority.
Secretary. The secretary of the Greater Turner Planning Advisory Commission, as duly appointed by the members governments of the Greater Turner Planning Advisory Commission.
Staff development review committee. A committee of public employees with specific technical expertise who are officially responsible to the Turner County board of commissioners for various public management functions. Under this ordinance, the staff development review committee shall assist the planning advisory commission and Turner County board of commissioners in the review of the numerous technical functions associated with the land subdivision process. This committee shall be appointed by the board of commissioners.
Streets and/or roads. A way or thoroughfare which can be and is generally used for travel but does not include service entrances or driveways leading off or from a street (road) on two adjoining properties. Streets and/or roads may be designated as public or private which shall be defined as follows:
(a) Public street and/or road. When the county, city, state, or federal government owns the right-of-way and is responsible for maintenance.
(b) Private street or road. When the right-of-way is owned by someone or some entity other than the county, city, state, or federal government. Private streets or roads shall conform to all specifications included in this ordinance. It is understood that the county will accept no substandard, unpaved streets. (See section 5-6.17.)
(c) Classifications. The streets and/or roads throughout the county shall further be defined as follows:
1. Arterial street: A street which is designated as such on the Major Thoroughfare plan and which is intended to provide swift and safe movement of traffic through the county.
2. Collector street: A street which is designated as such on the major thoroughfare plan and which is intended to collect traffic from local streets and direct it safely to arterial streets.
3. Dead-end street: A street having only one end open for access to another street, and the other end being abruptly terminated with no turnaround.
4. Marginal access street: A street generally parallel to and adjacent to an arterial street providing access to abutting properties and protection from through traffic.
5. Local street: A street used for local circulation in areas prodding access to abutting property.
Subdivider. Any person, firm, corporation, association or partnership or any agent thereof who undertakes or proposes to undertake the subdivision of land so as to constitute a subdivision as herein defined.
Subdivider's engineer/surveyor. Any professional engineer or land surveyor as defined in O.C.G.A. § 43-15-02, providing the services therein defined.
Subdivision. All divisions of a tract or parcel of land into two or more lots, tracts, parcels, building sites, or other divisions for the purpose, whether immediate or future, for sale, legacy, or building development including all division of land involving a new street or a change of width or alignment in existing street(s), and including resubdivision and, where appropriate to the context, relating to the process of subdividing or to the land or area subdivided;
provided, however, that the following are not included within this definition:
a. Where located on an existing public road or street, the combination or recombination of previously platted lots, where the total number of lots is not increased, and the resultant lots are equal to the current standards of the county.
b. The public acquisition of land.
c. The sale of public land.
d. The subdivision of land into parcels of ten acres or more where located on an existing public (county maintained) road. Each ten acre or larger parcel must abut a public road a minimum of 80 feet, and shall meet minimum width requirements established for the respective zoning district.
e. A division or sale of land among heirs by judicial decree, provided that all lots created by the subdivision must front existing state or, city roads or an approved private road, and lot size, frontage, and access requirements dictated in the zoning ordinance have been met.
Subdivision plans. Subdivision plans are interpreted to be all plans required for delineation of rights-of-way, easements, lots, preservation areas, etc., and all construction plans required for the development of all physical facilities pertaining thereto.
Tax assessor. The Turner County board of tax assessors.
Tract. A portion of land with definite and ascertainable limits or boundaries. (See definition of Lot.)
Turner County health department. The Turner County board of health department and/or the State of Georgia Department of Human Resources. The words "Turner County health department" and/or "Turner County environmental officer" are used in this ordinance to denote the fact that all matters pertaining to health regulations shall be directed to that official or his staff.
Utility. Any community service available to the public by means of an overhead or underground distribution or collection system such as electricity, telecommunications, water, gas, and sewage disposal.
Variance. The relaxation of a dimensional requirement or design standard described within this ordinance as it applies to the development of a particular tract or parcel of land reviewed by the Greater Turner County Planning Advisory Commission and approved by the Turner County board of commissioners on an individual basis, after proper public hearing.
Zoning administrator. The person or persons appointed by the board of commissioners of Turner County to coordinate among various agencies involved in review and approval of subdivision plans and ensure compliance of subdividers to administrative requirements of this ordinance.
Zoning ordinance. The zoning ordinance enacted by the Turner County board of commissioners, Ashburn, Georgia, as duly amended.
History
(Res. No. 2005-03-01, 3-10-2005)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.