--- title: Turner County Zoning Ordinance, Sec. 5-2. Easements collection: local-codes id: local-code:turner-county/zoning/5-2 cite_as: Turner County, Ga., Zoning Ordinance ยง 5-2 canonical_url: https://georgiacommons.org/code/local/turner-county/zoning/5-2 md_url: https://georgiacommons.org/code/local/turner-county/zoning/5-2.md text_url: https://georgiacommons.org/code/local/turner-county/zoning/5-2/text source_url: https://library.municode.com/ga/turner_county/codes/code_of_ordinances date: 2010-11-02 status: active jurisdiction: county:turner jurisdiction_name: Turner County county_fips: "13287" corpus_version: local-codes-turner-county-ef52ec4ba9b8 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/turner-county/zoning/~appendix-b/~article-v.md previous: https://georgiacommons.org/code/local/turner-county/zoning/appendix-b-article-v-5-1.md next: https://georgiacommons.org/code/local/turner-county/zoning/5-3.md index: https://georgiacommons.org/code/local/turner-county.md branch: zoning edition: As published by Municode, current through 2010-11-02 edition_date_kind: current_through source_publisher: Municode version_id: local-code:turner-county/zoning/5-2@2010-11-02-91dc0ad9e4 --- # Turner County Zoning Ordinance, Sec. 5-2. Easements > As published by Municode, current through 2010-11-02 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISIONS / Article V - MINIMUM DESIGN STANDARDS 5-2.1. Utility. Utility locations, where feasible, shall be located within the platted street right-of-way; easements are required, they shall be a minimum width of 20 feet. Telecommunications and electric lines may be located on the same side or opposite sides of the streets. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within said subdivision or phase thereof. 5-2.2. Drainage. No subdivision plat shall be accepted or approved unless it includes a hydrology plan and a sedimentation and soil erosion control plan certified by a professional engineer or registered land surveyor. The plan shall provide a means of detaining storm[water] and surface water runoff on site, up to and including a 25-year flood event, with such runoff to be released from the property at the same rate of flow that existed prior to the development of property. The engineer or surveyor shall certify that the designed stormwater detention system for the development will fully satisfy these provisions. The county engineer will verify the accuracy of the drainage plans and may call upon the services of other design professionals for review at the expense of the developer should on-site conditions warrant more detailed review. The developer is solely responsible for the accuracy of all the submitted plans.