5-2.1. Utility. Utility locations, where feasible, shall be located within the platted street right-of-way; easements are required, they shall be a minimum width of 20 feet. Telecommunications and electric lines may be located on the same side or opposite sides of the streets. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within said subdivision or phase thereof. 5-2.2. Drainage. No subdivision plat shall be accepted or approved unless it includes a hydrology plan and a sedimentation and soil erosion control plan certified by a professional engineer or registered land surveyor. The plan shall provide a means of detaining storm[water] and surface water runoff on site, up to and including a 25-year flood event, with such runoff to be released from the property at the same rate of flow that existed prior to the development of property. The engineer or surveyor shall certify that the designed stormwater detention system for the development will fully satisfy these provisions. The county engineer will verify the accuracy of the drainage plans and may call upon the services of other design professionals for review at the expense of the developer should on-site conditions warrant more detailed review. The developer is solely responsible for the accuracy of all the submitted plans.