Skip to content
Georgia Commons
Menu

Turner County · Zoning Ordinance

Appendix B - SUBDIVISIONS / Article V - MINIMUM DESIGN STANDARDS

Sec. 5-3. Lots.

About this text

  • As published by Municode, current through 2010-11-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

5-3.1. Minimum lot elevation. The lot area contained within and contiguous to the building walls and for minimum distance of ten feet measured from all sides of said building shall have a minimum elevation of three feet above the 100-year flood stage of streams or canals in the particular area being developed based on acceptable engineering procedure and approved by the county engineer. Said minimum elevation shall be subject to approval by the Turner County health department. A change in elevation necessary to meet this requirement will be permitted by filling within a designated flood hazard zone, only if all other applicable permits are obtained prior to any fill work being done.

(a) Floodprone areas. All preliminary and final plats shall clearly delineate identified floodplain areas in conformance with the Turner County floodplain management ordinance.

(b) Wetlands. All final and preliminary plats shall clearly delineate any identified wetlands in conformance with the Georgia Department of Environmental Protection's 9-A of the Turner County zoning ordinance.

5-3.2. Lot width and lot area requirements. Lots hereafter established within a subdivision shall conform to the lot area and lot width requirements set forth in the zoning ordinance for Turner County or in other sections of this ordinance.

5-3.3. Corner lots. Corner lots shall be of such size and dimensions that will permit the location of buildings so as to conform with the building setback lines as prescribed in the zoning ordinance. Corner property lines at street intersections shall have a minimum of a 30-foot deeded radius or a 30-foot permanent miter.

5-3.4. Double and reverse frontage. Lots having street frontage both to the front and rear shall be prohibited (unless allowed by variance) except to provide for separation of residential development from railroad right-of-way or arterial or collector street rights-of-way. Where the aforementioned abuts or runs through any portion of the subdivision, the subdivision plan shall provide for lots backing on said railroad or right-of-way, or arterial or collector street right-of-way. All lots shall have a minimum depth adequate to provide for the rear yard setback, required by the respective zoning district, plus an additional 30 feet, ten feet of which shall be a planted, nonencroachable buffer strip separating the lots from the right-of-way. The buffer zone shall be landscaped with hedges or closely planted small trees to provide a visual screen and shall be planted at the time of development. Said planted, nonencroachable buffer strip shall be clearly indicated on the final plat.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:turner-county/zoning/5-3@2010-11-02-a0dc9b4683

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Turner County Zoning Ordinance, Sec. 5-3. Lots | Georgia Commons