--- title: Turner County Zoning Ordinance, Sec. 6-13. Installation of improvements collection: local-codes id: local-code:turner-county/zoning/6-13 cite_as: Turner County, Ga., Zoning Ordinance ยง 6-13 canonical_url: https://georgiacommons.org/code/local/turner-county/zoning/6-13 md_url: https://georgiacommons.org/code/local/turner-county/zoning/6-13.md text_url: https://georgiacommons.org/code/local/turner-county/zoning/6-13/text source_url: https://library.municode.com/ga/turner_county/codes/code_of_ordinances date: 2010-11-02 status: active jurisdiction: county:turner jurisdiction_name: Turner County county_fips: "13287" corpus_version: local-codes-turner-county-ef52ec4ba9b8 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/turner-county/zoning/~appendix-b/~article-vi.md previous: https://georgiacommons.org/code/local/turner-county/zoning/6-12.md next: https://georgiacommons.org/code/local/turner-county/zoning/appendix-b-article-vii-7-1.md index: https://georgiacommons.org/code/local/turner-county.md branch: zoning edition: As published by Municode, current through 2010-11-02 edition_date_kind: current_through source_publisher: Municode version_id: local-code:turner-county/zoning/6-13@2010-11-02-df11ed3134 --- # Turner County Zoning Ordinance, Sec. 6-13. Installation of improvements > As published by Municode, current through 2010-11-02 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISIONS / Article VI - MINIMUM IMPROVEMENTS No grading, paving, or construction of any required improvements shall be permitted until the preliminary plat and improvements plan of the subdivision has been approved by the planning advisory commission. 6-13.1. Said developer can begin installation of the minimum improvements, including grading, paving, installation of utilities, etc., upon approval of the construction drawings. In all cases, sedimentation control devices, retention, detention or sedimentation ponds shall be first in order of construction. 6-13.2. Final plat approval by the planning advisory commission and acceptance by the Turner County board of commissioners can be requested during or following the installation of minimum improvements. 6-13.3. Improvements required and/or regulated by this ordinance shall be constructed in accordance with approved plans and specifications, the standards, requirements and regulations set forth in these regulations, and other applicable ordinances of the county. 6-13.4. Construction of improvements required or regulated by these regulations shall not commence until the county engineer has approved in writing the plans and specifications for said improvements. 6-13.5. The subdivider or subdivider's engineer, surveyor or consultant shall notify the county engineer of the commencement, suspension, or resumption of work at least one day prior to the commencement, suspension or resumption of such work. This requirement shall not apply to work suspended due to adverse weather conditions. In the event that the subdivider or subdivider's engineer, surveyor or consultant fails to comply with this requirement, the county engineer is hereby authorized to take whatever steps may be necessary to insure that work performed complies with the approved plans and specifications, the standards set forth in these regulations, and other applicable ordinances of the county. 6-13.6. If, in the course of construction, the subdivider wishes to modify the size, type, quality, quantity and/or location of any or all of the improvements required or regulated by these regulations, the subdivider's engineer, surveyor or consultant shall submit a written change request to the county engineer for review and written approval prior to proceeding with installation of the modified improvement. 6-13.7. Tests required by these regulations shall be performed solely by independent testing laboratories, the subdivider's engineer, surveyor or consultant or qualified personnel employed by the subdivider's engineer, surveyor or consultant, and shall be performed at the subdivider's expense. The subdivider's engineer, surveyor or consultant shall direct that the results of required tests be mailed or delivered to the county engineer immediately on completion. All test results must be clearly indicated as to the project and the exact location of the sample and that no test results be [is] withheld from the county engineer.