Within the unincorporated area of Turner County, the subdivider shall install paving with centerline striping and proper drainage, which includes ditch slopes and grassing requirements and proper drainage control structures which may include paved ditches and canals, canals, and retention areas. The county also requires established grass cover on road shoulders, front and back slopes of ditches and erosion control devices at outfall locations are required in subdivisions within the unincorporated areas of Turner County. All streets and roads shall be paved according to standards set by the Georgia Department of Transportation Standard Specifications for Roads and Bridges. The county engineer will determine the type of base material to be used on each and all subdivisions based on conditions and sound engineering judgment prior to beginning any grading work. These materials shall be applied according to established construction methods and shall be subject to inspection by and final approval by the county engineer prior to acceptance for public maintenance.