Skip to content
Georgia Commons
Menu

Turner County · Zoning Ordinance

Appendix B - SUBDIVISIONS / Article IV - APPROVAL OF SUBDIVISIONS

Sec. 4-1. Preliminary plat.

About this text

  • As published by Municode, current through 2010-11-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

4-1.1. Purpose. The purpose of the preliminary plat is to safeguard the subdivider from unnecessary loss of time and expense in preparation of a subdivision plat which does not conform with the specifications of the subdivision ordinance. The preliminary plat requires only approximate accuracy of scale and dimension. Public agencies having jurisdiction will review preliminary plats regarding matters within their jurisdiction. During the review process, the subdivider or his agent may be called upon for consultation.

4-1.2. Subdivisions requiring no new street, water, or sewer facilities. All subdivisions which do not involve the platting, construction, or opening of new streets, water or sewer facilities may be accepted by the Turner County zoning administrator in the form of a final plat, provided that essential data required by the reviewing agencies to insure compliance with the intent of this ordinance is submitted.

4-1.3. Filing. Any person desiring to subdivide land shall file with the Turner County zoning administrator five copies of the preliminary plat accompanied by a letter of application.

The letter of application will describe the proposed subdivision at length and will also state for what purposes easements may be utilized for such as water, streets, power or telecommunications maintenance. There will not be any restrictions on the use of easements. The letter of application shall contain the name and address of the developer(s) and his agent(s), the zoning of the property to be subdivided, whether or not the subdivision will be developed in phases, plans for annexation, and plans for serving the proposed subdivision with sewer and water facilities. The plat shall be prepared in accordance with this ordinance and with applicable county specifications by a registered land surveyor, who is licensed under the laws of the State of Georgia. The preliminary plat shall be deemed filed with the planning commission when it is filed with the Turner County zoning administrator. At the time of filing, a certificate of filing shall be provided to the subdivider and shall include the time and date of filing. The zoning administrator shall have authority to reject the preliminary plat if they find it does not comply with this ordinance. If rejected, the zoning administrator shall provide the subdivider with a written statement specifying all the respects in which the plat fails to comply. The subdivider may appeal to the planning advisory commission from such rejection. Filing of the preliminary plat shall be accomplished at least 30 days prior to the regular planning advisory commission meeting at which it is to be considered. The preliminary plat shall include:

a. Title block and north arrow: The plat will show the name of the proposed subdivision, its location, the name, address and registration number of the surveyor preparing the plat and the date of the plat. A north arrow shall be included with a notation referencing the bearings to magnetic north, astronomical north or grid north.

b. General layout: The plat shall show information as to the proposed street layout and widths, layout of lots with a notation as to the minimum size and width of lots and proposed open space if any. Any lands to be dedicated will be clearly identified. Plat scale shall be one inch equals 100 feet. Scale, total acreage of the site and total number of lots created shall be indicated. Lot and block identification and building setback lines shall also be indicated.

c. Topography: The plat shall show existing contour lines dashed and any proposed contour lines solid, both set of lines to be at ten-foot intervals (quad sheets), mean sea level (M.S.L.) Prominent drainage features such as lakes, depressions, streams, etc., which could affect the design of the subdivision shall be shown. Engineering data showing the high water elevation and how it was established shall be submitted with the plat.

d. Existing features: The plat shall show the locations and names of existing and platted property lines, streets (and its right-of-way), railroads (and its right-of-way), public and private rights-of-way, sanitary sewer (and size), water mains (and size), bridges, culverts, storm drainage (and size), easements, parks and other public open spaces, land lot and land district lines, city limits lines, and names of adjoining property owners or subdivisions. Groups of trees and wetland areas shall also be indicated.

e. Location map: The plat shall include a small scale map of sufficient clarity so that the location of the proposed subdivision can be readily determined.

f. Water and sewer: A statement from the subdivider shall be submitted with the preliminary plat which will describe the method by which sanitary sewer and water facilities will be provided.

g. Future tract plan: In cases where a subdivision is to be developed in stages with additional plats being filed with the planning advisory commission at a later date(s), the filing of the initial plat will be accompanied by future tract plan, a reasonably accurate plat in sketch form of the entire tract which will show the future street system and topography (quad sheets) for the entire tract. Once the required tract plan has been given approval by the planning advisory commission, five copies of the approved future tract plan must be provided for distribution to the various reviewing agencies and the inspections office.

h. Wetlands: Approximate location of wetlands boundaries shall be delineated on the preliminary plat. All preliminary plats delineating wetlands shall have on the face of said preliminary plat the note: "No fill or work shall be permitted within jurisdictional wetlands without a prior permit from the U.S. Army Corps of Engineers." All minimum lot areas per designated zoning classification requirements shall be calculated upland of any wetlands boundaries within or contiguous to the project.

4-1.4. Completeness. If any of the above required information is omitted or misrepresented on the plat, the Turner County zoning administrator may refuse to review the plat, and shall return the plat to the subdivider to be completed or revised.

4-1.5. Approval by individual agencies. No preliminary plat shall be approved by the planning advisory commission unless it is approved by the staff development review committee. Said agencies shall, with or without modification, approve or disapprove the preliminary plat to the extent that each has jurisdiction. If the plat is rejected, the respective reviewing agency shall provide the planning advisory commission with a written statement specifying all aspects where the plat fails to comply.

4-1.6. Staff development review committee. Upon receipt of the filing of the preliminary plat, the zoning administrator shall prepare those materials for presentation to the staff development review committee. The staff development review committee shall review the preliminary plat for technical compliance with the Turner County land subdivision ordinance, zoning ordinance, comprehensive plan, and other county ordinances that might impact the proposed land subdivision. The staff development review committee shall recommend in writing approval, conditional approval, postponement or disapproval within 30 days of submission.

4-1.7. Coordination. It shall be the responsibility of the zoning administrator to ensure that the respective reviews of the staff development review committee are brought together in a timely fashion for proper presentation to the planning advisory commission.

4-1.8. Review by planning advisory commission. The planning advisory commission shall review the preliminary plat, giving due consideration to the review of the staff development review committee. The planning advisory commission shall then recommend to the Turner County board of commissioners for preliminary approval, conditional approval, postponement or disapproval within 30 days of submission. The subdivider may waive in writing this requirement and consent to an extension of such period.

a. Preliminary approval means that the developer is now authorized to proceed with the preparation of the required improvement plans, outlined in detail under section 4-2.

No developer shall proceed with any construction or any other work in the proposed subdivision before obtaining preliminary approval of these improvement plans in writing. Lots shall not be sold nor shall building construction begin at this time.

Preliminary approval grants the developer a maximum time of 18 months within which he shall submit his improvements plan and final plat for approval unless a time extension is granted by the planning advisory commission before the expiration of the 18-month period. If such time extension is granted, it shall be for not more than 12 additional months. Failure to submit improvement plans and final plat within this time period, including extension if any, shall invalidate preliminary plat approval, and require resubmission of preliminary plat. Additionally, if, in the opinion of the staff development review committee, substantial changes have been made to the approved preliminary plat, the revised plat shall be resubmitted as a new preliminary plat.

b. Conditional approval means the developer may proceed after written notice from the zoning administrator, as outlined under "preliminary approval" but only after he has submitted at least five copies of the corrected preliminary plan to the zoning administrator, noting thereon the condition or changes required by the approval of the planning advisory commission.

c. Postponement means action is delayed for specific reasons which shall be noted and transmitted in writing to the developer by the zoning administrator. Postponed preliminary plans may be reconsidered by the planning advisory commission without resubmittal to the staff development review committee and the Turner County health department.

d. Disapproval means denial of the application for subdivision because the developer's plans are not in compliance with this ordinance. For further consideration, the developer must rework and resubmit his plans as though they were a completely new preliminary plan. The specific reasons for disapproval shall be stated to allow for correction.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:turner-county/zoning/appendix-b-article-iv-4-1@2010-11-02-063fddd3cf

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Turner County Zoning Ordinance, Sec. 4-1 (Appendix B, Article IV). Preliminary plat | Georgia Commons