No environmentally sensitive use or activity required to use these performance standards shall be located within an area that has been designated as a “most significant groundwater recharge area” on the GROUND-WATER POLLUTION SUSCEPTIBILITY MAP OF GEORGIA, Hydrologic Atlas 20; provided, however, an expansion of an existing permitted Municipal Solid Waste Landfill is an allowed use if the expansion area will have a liner and leachate collection system as required by O.C.G.A. § 12-8-25.2 and such expansion satisfies the state permit requirement in Section 9.14.1.”