--- title: Twin City Zoning Ordinance, Sec. 6-4-305. Application for building permit collection: local-codes id: local-code:twin-city/zoning/6-4-305 cite_as: Twin City, Ga., Zoning Ordinance § 6-4-305 canonical_url: https://georgiacommons.org/code/local/twin-city/zoning/6-4-305 md_url: https://georgiacommons.org/code/local/twin-city/zoning/6-4-305.md text_url: https://georgiacommons.org/code/local/twin-city/zoning/6-4-305/text source_url: https://library.municode.com/ga/twin_city/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:twin-city jurisdiction_name: Twin City place_fips: "1377988" corpus_version: local-codes-twin-city-3c62c92d296b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/twin-city/zoning/~part-ii/~title-6/~chapter-4/~article-o.md previous: https://georgiacommons.org/code/local/twin-city/zoning/6-4-304.md next: https://georgiacommons.org/code/local/twin-city/zoning/6-4-306.md index: https://georgiacommons.org/code/local/twin-city.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:twin-city/zoning/6-4-305@2026-11-11-1377df505d --- # Twin City Zoning Ordinance, Sec. 6-4-305. Application for building permit > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Title 6 - PLANNING AND DEVELOPMENT / Chapter 4 - ZONING / Article O - ADMINISTRATION, ENFORCEMENT, FEES AND PENALTIES (a) This application for a building permit shall be made in writing to the zoning administrator on forms provided for that purpose. The applicant shall submit a site plan at a suitable scale showing the shape, size and location of the lot to be built upon, and the shape, size, height, use and location of the buildings to be erected, altered or moved and of any buildings already on the lot, the number of dwelling units the building is designed to accommodate, the setback line of the buildings on adjoining lots and any other information needed to determine whether the provisions of the chapter are being observed. Pictures of the lot should be included unless impracticable. (b) If the application conforms with the provisions of this chapter, the city building codes and other ordinances of the city, the zoning administrator shall issue a permit upon payment of the required fee. If not, the building permit shall be refused by the zoning administrator stating such refusal in writing with the cause. Approval or denial of the application by the zoning administrator shall be in accordance with section 6-4-301. (c) If no substantial progress on construction has been made within six months beginning with the date the permit is issued, the permit becomes invalid. The zoning administrator may renew the permit. A renewal fee is required to be paid by the applicant before the permit is renewed. ## History (Ord. of 6-3-1997, § 15-6; Res. of 11-3-2020, att.(15-7))