(a) This application for a building permit shall be made in writing to the zoning administrator on forms provided for that purpose. The applicant shall submit a site plan at a suitable scale showing the shape, size and location of the lot to be built upon, and the shape, size, height, use and location of the buildings to be erected, altered or moved and of any buildings already on the lot, the number of dwelling units the building is designed to accommodate, the setback line of the buildings on adjoining lots and any other information needed to determine whether the provisions of the chapter are being observed. Pictures of the lot should be included unless impracticable. (b) If the application conforms with the provisions of this chapter, the city building codes and other ordinances of the city, the zoning administrator shall issue a permit upon payment of the required fee. If not, the building permit shall be refused by the zoning administrator stating such refusal in writing with the cause. Approval or denial of the application by the zoning administrator shall be in accordance with section 6-4-301. (c) If no substantial progress on construction has been made within six months beginning with the date the permit is issued, the permit becomes invalid. The zoning administrator may renew the permit. A renewal fee is required to be paid by the applicant before the permit is renewed.