--- title: Twin City Zoning Ordinance, Sec. 6-4-407. Abandonment and removal collection: local-codes id: local-code:twin-city/zoning/6-4-407 cite_as: Twin City, Ga., Zoning Ordinance § 6-4-407 canonical_url: https://georgiacommons.org/code/local/twin-city/zoning/6-4-407 md_url: https://georgiacommons.org/code/local/twin-city/zoning/6-4-407.md text_url: https://georgiacommons.org/code/local/twin-city/zoning/6-4-407/text source_url: https://library.municode.com/ga/twin_city/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:twin-city jurisdiction_name: Twin City place_fips: "1377988" corpus_version: local-codes-twin-city-3c62c92d296b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/twin-city/zoning/~part-ii/~title-6/~chapter-4/~article-s.md previous: https://georgiacommons.org/code/local/twin-city/zoning/6-4-406.md next: https://georgiacommons.org/code/local/twin-city/zoning/6-4-408.md index: https://georgiacommons.org/code/local/twin-city.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:twin-city/zoning/6-4-407@2026-11-11-4289ef85d9 --- # Twin City Zoning Ordinance, Sec. 6-4-407. Abandonment and removal > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Title 6 - PLANNING AND DEVELOPMENT / Chapter 4 - ZONING / Article S - SOLAR ENERGY SYSTEMS AND SOLAR ENERGY PRODUCTION FACILITIES (a) The following requirements shall be met for decommissioning solar farms: (1) Each applicant for a permit must submit decommissioning plans that describe the anticipated life of the solar project, the party responsible for decommissioning, the estimated decommissioning costs in current dollars, and the method for ensuring by bond that funds will be available for decommissioning and restoration. (2) Solar farms which have not been in active and continuous service for a period of one year shall be removed at the owner's or operator's expense. (3) The site shall be restored to as natural condition as possible within six months of the removal. (4) A site will be considered decommissioned when, after inspection and approval by the city, all structures and equipment are removed and the site is re-vegetated. If a ground-mounted solar energy system is removed, any earth disturbance as a result of the removal shall be landscaped in accordance with local regulations. (b) If a solar energy system or facility is removed, all components shall be recycled or reused to the greatest extent practicable. ## History (Res. of 11-3-2020, att.(art. XIX, § 7))