11-3. Application for building permit.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All applications for building permits for single family residences (including manufactured homes), duplexes, and agricultural buildings and their accessory uses are exempt from detailed site plan application requirements. Applications for permits for these uses may be hand drawn but must properly show the correct dimensions of the proposed building lot and the proposed structure so as to allow planning, environmental and engineering staff to properly inform the applicant of setback requirements, spacing requirements for well and/or septic, driveway location requirements, and other ordinance/ Code requirements.

All other land uses (multi-family and all commercial and industrial uses) shall require a more detailed site plan. Applications for multi-family, commercial and industrial uses shall require the submittal of a plat of survey of the proposed building lot accompanied by two side plans drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the lot, number of dwelling units (if applicable), footprint dimensions to scale, and the setback lines of the proposed structures. Topographic lines at mean sea level, both existing and proposed, drainage plans, proposed size and location of ingress/egress, water and/or sewer mains and services, both existing and proposed, including hydrants and meter size shall also be shown so as to allow planning, environmental and engineering staff to properly review the development proposal to ensure compliance with the zoning ordinance and other applicable Code standards.

Any building permit shall become void if the work involved has not begun within six months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six months after the work of development is commenced; provided that extensions of time and periods not exceeding six months each may be allowed in writing by the zoning administrator. Any unapproved deviation from the site plan shall cause the zoning administrator to not issue a certificate of occupancy.

The applicant for a building permit shall submit a certificate with his application which certifies that the lot which he proposes to develop is a lot of record. When the lot in question does not meet the lot width and lot area requirements of this ordinance, then the applicant shall certify that such lot was a lot of record prior to the adoption of this ordinance or is a lot which has been created through governmental taking of property.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:ty-ty/zoning/11-3@2026-11-11-351872f47e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Ty Ty Zoning Ordinance, 11-3. Application for building permit | Georgia Commons