--- title: Tybee Island Zoning Ordinance, Sec. 16-160. Stormwater management plan requirements collection: local-codes id: local-code:tybee-island/zoning/16-160 cite_as: Tybee Island, Ga., Zoning Ordinance § 16-160 canonical_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-160 md_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-160.md text_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-160/text source_url: https://library.municode.com/ga/tybee_island date: 2026-11-11 status: active jurisdiction: city:tybee-island jurisdiction_name: Tybee Island place_fips: "1378036" corpus_version: local-codes-tybee-island-011053e90ad4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/tybee-island/zoning/~appendix-a/~article-16/~division-b.md previous: https://georgiacommons.org/code/local/tybee-island/zoning/16-150.md next: https://georgiacommons.org/code/local/tybee-island/zoning/16-170.md index: https://georgiacommons.org/code/local/tybee-island.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:tybee-island/zoning/16-160@2026-11-11-50699834f6 --- # Tybee Island Zoning Ordinance, Sec. 16-160. Stormwater management plan requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division B - STORMWATER MANAGEMENT FOR DEVELOPMENT ACTIVITIES A stormwater management plan shall include as a minimum the following: (1) Site plan which conforms to all pertinent provisions of the subdivision regulation ordinance; (2) Soil erosion/sediment control plan; (3) Drainage report. The drainage report will contain a narrative that discusses pre- and post-development conditions and impacts for all upstream and downstream stormwater management facilities. The report shall include a site location plan, a detailed site plan for both the pre- and post-development conditions, pre- and post-development watershed boundaries, and all runoff and drainage system design calculations for the proposed development for the one-, five-, ten-, and 25-year 24-hour storms. Drainage calculations shall be performed using methods accepted by the director, as specified in the stormwater management guideline for private development activities. (4) For development activities in the special flood hazard areas (zones A, V, AE, and VE on the latest Federal Emergency Management Agency/National Flood Insurance rate maps), areas that are known to have flooded repetitively, or areas where a hydrologic model predicts flooding will occur in the 100-year, 24-hour event, the developer must demonstrate that the 100-year flood elevations will have no increase resulting from development activity. ## History (Ord. No. 42-2014, § 1, 10-10-2014)