A stormwater management plan shall include as a minimum the following: (1) Site plan which conforms to all pertinent provisions of the subdivision regulation ordinance; (2) Soil erosion/sediment control plan; (3) Drainage report. The drainage report will contain a narrative that discusses pre- and post-development conditions and impacts for all upstream and downstream stormwater management facilities. The report shall include a site location plan, a detailed site plan for both the pre- and post-development conditions, pre- and post-development watershed boundaries, and all runoff and drainage system design calculations for the proposed development for the one-, five-, ten-, and 25-year 24-hour storms. Drainage calculations shall be performed using methods accepted by the director, as specified in the stormwater management guideline for private development activities. (4) For development activities in the special flood hazard areas (zones A, V, AE, and VE on the latest Federal Emergency Management Agency/National Flood Insurance rate maps), areas that are known to have flooded repetitively, or areas where a hydrologic model predicts flooding will occur in the 100-year, 24-hour event, the developer must demonstrate that the 100-year flood elevations will have no increase resulting from development activity.