Skip to content
Georgia Commons
Menu

Tybee Island · Zoning Ordinance

Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division B - STORMWATER MANAGEMENT FOR DEVELOPMENT ACTIVITIES

Sec. 16-190. Minimum stormwater system design standards.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) There shall be no increase in the base flood elevation within the special flood hazard area (SFHA), as delineated by the latest National Flood Insurance Program (NFIP) maps, or in any areas that are known to have flooded repetitively, or areas where a hydrologic model predicts flooding will occur in the 100-year, 24-hour event. Where hydrologic model results are conflicting, the stormwater management director shall decide which model will be used.

(b) Finished floor elevations for structures not included in the special flood hazard area shall be equal to or higher than that shown on the original subdivision plat or neighborhood grading and drainage plan or as determined by a registered civil engineer.

(c) The post-development peak rate of runoff cannot exceed the predevelopment peak rate of runoff for the one-, five-, ten-, and 25-year 24-hour events. Exception to this requirement shall be made for single-family homes provided that post-development run-off does not exceed one cubic feet per second (CFS). Exception shall also be made for single family lots that lie within a subdivision with an approved drainage plan.

(d) In all submittals, if drainage calculations indicate that post-development runoff will exceed predevelopment runoff, then on-site detention for the one-, five-, ten-, and 25-year 24-hour events is required at a discharge rate equal to or less than the pre-developed 24-hour peak rate of discharge for all storm events from the one-, five-, ten-, and including the 25-year event, or the capacity of the existing downstream conveyance system must be upgraded in capacity to accommodate the additional 25-year, 24-hour discharge generated by the new development. On projects that lie within drainage basins for which the city believes to have insufficient outfall or has knowledge of flooding that would be intensified by the proposed development, the 50- and 100-year events will also be considered in the drainage and drainage calculations. Where outfall is not existing or feasible, the city may allow retention. Stormwater management by retention will be for all events up to and including the 100-year storm.

(e) Drainage easements. The width and configuration requirements of drainage and maintenance easements/rights-of-way are listed in Section 2.30 of the Stormwater Management Guide for Private Development.

History

The history line the source prints at the end of the section.

(Ord. No. 42-2014, § 1, 10-10-2014)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:tybee-island/zoning/16-190@2026-11-11-acc976bd46

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Tybee Island Zoning Ordinance, Sec. 16-190. Minimum stormwater system design standards | Georgia Commons