This division addresses post-construction stormwater management in Georgia's Coastal Nonpoint Source Management Area. This division establishes requirements for stormwater plans that are to be submitted before land development commences. The plans document how post-construction stormwater runoff quality and quantity will be effectively managed according to performance criteria described in this division. Guidelines for inspection, maintenance, and violations are also included. This division is linked with existing stormwater management manuals including the Georgia Stormwater Management Manual, the Coastal Stormwater Supplement and local design manuals that provide the technical specifications for stormwater system design.