--- title: Tybee Island Zoning Ordinance, Sec. 16-340. Stormwater management concept plan and consultation meeting collection: local-codes id: local-code:tybee-island/zoning/16-340 cite_as: Tybee Island, Ga., Zoning Ordinance § 16-340 canonical_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-340 md_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-340.md text_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-340/text source_url: https://library.municode.com/ga/tybee_island date: 2026-11-11 status: active jurisdiction: city:tybee-island jurisdiction_name: Tybee Island place_fips: "1378036" corpus_version: local-codes-tybee-island-011053e90ad4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/tybee-island/zoning/~appendix-a/~article-16/~division-ii.md previous: https://georgiacommons.org/code/local/tybee-island/zoning/16-330.md next: https://georgiacommons.org/code/local/tybee-island/zoning/16-350.md index: https://georgiacommons.org/code/local/tybee-island.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:tybee-island/zoning/16-340@2026-11-11-2ddd8b4f19 --- # Tybee Island Zoning Ordinance, Sec. 16-340. Stormwater management concept plan and consultation meeting > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT Prior to the submittal of a stormwater management design plan, inspection and maintenance agreement and plan, and permit application, the landowner or developer shall submit to the city for review and approval, a preliminary concept plan describing, in general, how stormwater runoff through and form the development will be conveyed and managed. The submittal should include the following components: (a) Natural resources inventory. A graphic illustration of the natural resources at the site as they exist prior to the start of the project. The natural resources inventory shall be prepared in accordance with section 16-420. (b) Proposed site plan. A graphic illustration of the proposed site layout including, at a minimum: existing and proposed topography; natural drainage features; perennial and intermittent streams; wetlands; soil types; groundwater recharge areas; floodplains; stands of trees and other vegetation; existing infrastructure; existing easements; proposed limits of clearing and grading; and location of proposed roads, buildings, parking areas, and other impervious surfaces. (c) Stormwater management concept plan. A graphic illustration of the proposed stormwater management system including, at a minimum; location of existing and proposed better site planning and design techniques, low impact development practices, and structural stormwater management practices; location of existing and proposed stormwater conveyance systems, such as grass channels, swales, and storm drains; flow paths; location of existing floodplains and floodways; the relationship of site to upstream and downstream properties and stormwater management systems; and the location of any proposed stream channel modifications, such as bridge or culvert crossings. The stormwater management concept plan shall utilize, to the maximum extent practical, better site planning and design techniques and low impact development practices to reduce stormwater runoff rates, volumes, and pollutant loads and reduce the site's impact on the watershed. Such techniques and practices include, but are not limited to: conservation and/or restoration of natural areas, such as forests, wetlands, and riparian buffers, minimization and/or disconnection of impervious surfaces, and small-scale distributed stormwater management practices that intercept and treat or otherwise manage stormwater runoff closer to its source. All applicants are encouraged to hold a consultation meeting with the city to discuss the proposed development project, the stormwater management concept plan, and opportunities to use better site planning and design techniques and low impact development practices to reduce runoff rates, volumes and pollutant loads and the site's impact on the watershed. This consultation meeting shall take place onsite after submittal, but prior to approval, of the stormwater management concept plan for the purposes of verifying site conditions and the feasibility of the stormwater management plan. Local watershed plans and any other relevant resource protection plans will be consulted during review of the stormwater management concept plan. If necessary, a follow-up meeting may be held with the applicant before formal site design commences to verify the feasibility of the stormwater management system that will be used to control and minimize the impacts of the proposed land development project. ## History (Ord. No. 42-2014, § 1, 10-10-2014)