Subsequent to approval of the stormwater management concept plan and completion of formal site design, the owner or developer shall submit to the city for review and approval, a stormwater management design plan that details how stormwater runoff through and from the development will be conveyed and managed. The stormwater management design plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this division, including the postconstruction stormwater management criteria set forth in subdivision 4. The submittal should include the following components: (1) Certification by plan preparer. The stormwater management design plan shall be prepared in accordance with the criteria outlined in this section by a certified design professional such as a landscape architect, professional surveyor, or professional engineer who must certify that the design of the stormwater management system meets the requirements of this division and the latest edition of the Coastal Stormwater Supplement, the Georgia Stormwater Management Manual, and any relevant local addenda. (2) Certification by owner. The owner shall certify that all land clearing, construction, land development and drainage will be done according to the approved stormwater management design plan. (3) Stormwater management design plan. The stormwater management design plan shall address the requirements of this division and ensure that better site planning and design techniques and low impact development practices are being used to the maximum extent practical to reduce stormwater runoff rates, volumes, and pollutant loads and reduce the site's impact on the watershed. The stormwater management design plan shall include maps, narrative descriptions, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The stormwater management design plan shall include all of the information required in the latest edition of the Coastal Stormwater Supplement, the Georgia Stormwater Management Manual, and any relevant local addenda. (4) Stormwater management concept plan. A copy of the approved stormwater management concept plan shall be included with the submittal of the stormwater management design plan. The stormwater management design plan shall be consistent with the approved concept plan. If changes to the proposed land development activity have resulted in modification of the approved concept plan, the city may require a revised concept plan or a written statement providing rationale for the changes made to the approved concept plan.