Tybee Island · Zoning Ordinance
Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT
Sec. 16-420. Natural resources inventory.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A graphic illustration of the natural resources at the development or redevelopment site, as they exist prior to the start of land development activities, shall be prepared during the site planning process. The Natural Resources Inventory shall include, at a minimum: existing topography; natural drainage features; perennial and intermittent streams; wetlands; riparian buffers; floodplains; steep slopes; soil types; groundwater recharge areas; areas with high groundwater; stands of trees and/or other vegetation; and areas with significant habitat value.
Protection, conservation and/or restoration of a site's natural resources through the use of better site planning techniques may, at the discretion of the city, allow for a reduction in stormwater runoff volume as a means of complying with the post-construction stormwater management criteria outlined in sections 16-430 through 16-480. The better site planning techniques that qualify for this credit, and the procedures for calculating the runoff reduction provided by these nonstructural stormwater management practices, is provided in the latest edition of the Coastal Stormwater Supplement.
History
(Ord. No. 42-2014, § 1, 10-10-2014)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.