--- title: Tybee Island Zoning Ordinance, Sec. 16-460. Groundwater recharge collection: local-codes id: local-code:tybee-island/zoning/16-460 cite_as: Tybee Island, Ga., Zoning Ordinance § 16-460 canonical_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-460 md_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-460.md text_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-460/text source_url: https://library.municode.com/ga/tybee_island date: 2026-11-11 status: active jurisdiction: city:tybee-island jurisdiction_name: Tybee Island place_fips: "1378036" corpus_version: local-codes-tybee-island-011053e90ad4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/tybee-island/zoning/~appendix-a/~article-16/~division-ii.md previous: https://georgiacommons.org/code/local/tybee-island/zoning/16-450.md next: https://georgiacommons.org/code/local/tybee-island/zoning/16-470.md index: https://georgiacommons.org/code/local/tybee-island.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:tybee-island/zoning/16-460@2026-11-11-cac4b672e2 --- # Tybee Island Zoning Ordinance, Sec. 16-460. Groundwater recharge > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT Groundwater recharge shall be preserved on a development or redevelopment site in order to preserve and/or replicate pre-development site hydrology, recharge shallow groundwater aquifers, and promote baseflow to on-site and downstream aquatic resources. A stormwater management system complies with this requirement if it provides groundwater recharge in accordance with the criteria and information provided in the latest edition of the Coastal Stormwater Supplement. The prescribed groundwater recharge volume on a development or redevelopment site, as defined in the latest edition of the Coastal Stormwater Supplement, shall be considered part of the runoff reduction volume defined in section 16-430, and shall not be managed in addition to the prescribed runoff reduction volume. Green infrastructure, which includes better site planning and design techniques and low impact development practices, shall be used to the maximum extent practical during the site planning and design process to preserve groundwater recharge on a development or redevelopment site. ## History (Ord. No. 42-2014, § 1, 10-10-2014)