All stormwater management systems shall be designed to control the post-development peak discharge generated by the overbank flood protection storm event, as defined in the latest edition of the Coastal Stormwater Supplement, to prevent an increase in the frequency and magnitude of damaging overbank flooding. A stormwater management system complies with this requirement if: (1) It provides overbank flood protection in accordance with the criteria and information provided in the latest edition of the Coastal Stormwater Supplement; and (2) Appropriate structural and nonstructural stormwater management practices have been selected, designed, constructed, and maintained in accordance with the standards, criteria, and information presented in the latest edition of the Coastal Stormwater Supplement and any relevant local addenda.