--- title: Tybee Island Zoning Ordinance, Sec. 16-490. Redevelopment criteria collection: local-codes id: local-code:tybee-island/zoning/16-490 cite_as: Tybee Island, Ga., Zoning Ordinance § 16-490 canonical_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-490 md_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-490.md text_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-490/text source_url: https://library.municode.com/ga/tybee_island date: 2026-11-11 status: active jurisdiction: city:tybee-island jurisdiction_name: Tybee Island place_fips: "1378036" corpus_version: local-codes-tybee-island-011053e90ad4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/tybee-island/zoning/~appendix-a/~article-16/~division-ii.md previous: https://georgiacommons.org/code/local/tybee-island/zoning/16-480.md next: https://georgiacommons.org/code/local/tybee-island/zoning/16-500.md index: https://georgiacommons.org/code/local/tybee-island.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:tybee-island/zoning/16-490@2026-11-11-86afea3592 --- # Tybee Island Zoning Ordinance, Sec. 16-490. Redevelopment criteria > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT Land development that qualifies as redevelopment shall meet one of the following criteria: (1) Reduce impervious cover. Reduce existing site impervious cover by at least 20 percent. (2) Provide stormwater management. Manage the stormwater runoff from at least 20 percent of the site's existing impervious cover and any new impervious cover in accordance with the post-construction stormwater management criteria outlined in sections 16-430 through 16-480 using stormwater management practices designed in accordance with the standards, criteria, and information presented in the latest edition of the Coastal Stormwater Supplement, the Georgia Stormwater Management Manual, and any relevant local addenda. (3) Provide off-site stormwater management. Provide a level of stormwater quality and quantity control that is equal to or greater than that which would be provided by on-site stormwater management practices, in accordance with section 16-400. (4) Combination of measures. Any combination of subsections (1)—(3) that is acceptable to the city. ## History (Ord. No. 42-2014, § 1, 10-10-2014)