Land development that qualifies as redevelopment shall meet one of the following criteria: (1) Reduce impervious cover. Reduce existing site impervious cover by at least 20 percent. (2) Provide stormwater management. Manage the stormwater runoff from at least 20 percent of the site's existing impervious cover and any new impervious cover in accordance with the post-construction stormwater management criteria outlined in sections 16-430 through 16-480 using stormwater management practices designed in accordance with the standards, criteria, and information presented in the latest edition of the Coastal Stormwater Supplement, the Georgia Stormwater Management Manual, and any relevant local addenda. (3) Provide off-site stormwater management. Provide a level of stormwater quality and quantity control that is equal to or greater than that which would be provided by on-site stormwater management practices, in accordance with section 16-400. (4) Combination of measures. Any combination of subsections (1)—(3) that is acceptable to the city.