Tybee Island · Zoning Ordinance
Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT
Sec. 16-520. Stormwater conveyance systems.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Stormwater conveyance systems, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutters, swales, channels, ditches, and energy dissipaters, shall be provided when necessary for the protection of public right-of-way and private properties adjoining development and redevelopment sites and/or public right-of-ways. Stormwater conveyance systems that are designed to convey stormwater runoff from more than one parcel shall meet the following requirements:
(1) Methods used to calculate stormwater runoff rates and volumes shall be in accordance with the latest edition of the Georgia Stormwater Management Manual;
(2) All culverts, pipe systems, and open channel flow systems shall be sized in accordance with the stormwater management design plan using the methods included in the latest edition of the Georgia Stormwater Management Manual; and,
(3) Planning and design of stormwater conveyance systems shall be in accordance with the criteria and specifications found in the latest edition of the Georgia Stormwater Management Manual.
History
(Ord. No. 42-2014, § 1, 10-10-2014)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.