Periodic inspections of the stormwater management practices shown on the approved stormwater management design plan shall be conducted by staff or representatives of the city during construction. Construction inspections shall utilize the approved stormwater management design plan for establishing compliance with the provisions of this division. All inspection shall be documented in written reports that contain the following information: (1) The date and location of the inspection; (2) The name of the inspector; (3) Whether construction is in compliance with the approved stormwater management design plan; (4) Violations of the approved stormwater management design plan; and, (5) Any other variations from the approved stormwater management plan. If any violations are found, the applicant shall be notified in writing about the nature of the violation and the remedial measures that are required to bring the action or inaction into compliance with the approved stormwater management design plan, as described in section 16-610. In the event that the remedial measures described in such notice have not been completed by the date set forth in the notice, any one or more of the enforcement actions outlined in section 16-620 may be taken against the applicant.