--- title: Tybee Island Zoning Ordinance, Sec. 16-550. Final inspection and as built plans collection: local-codes id: local-code:tybee-island/zoning/16-550 cite_as: Tybee Island, Ga., Zoning Ordinance § 16-550 canonical_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-550 md_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-550.md text_url: https://georgiacommons.org/code/local/tybee-island/zoning/16-550/text source_url: https://library.municode.com/ga/tybee_island date: 2026-11-11 status: active jurisdiction: city:tybee-island jurisdiction_name: Tybee Island place_fips: "1378036" corpus_version: local-codes-tybee-island-011053e90ad4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/tybee-island/zoning/~appendix-a/~article-16/~division-ii.md previous: https://georgiacommons.org/code/local/tybee-island/zoning/16-540.md next: https://georgiacommons.org/code/local/tybee-island/zoning/16-560.md index: https://georgiacommons.org/code/local/tybee-island.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:tybee-island/zoning/16-550@2026-11-11-9dc02f19d4 --- # Tybee Island Zoning Ordinance, Sec. 16-550. Final inspection and as built plans > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - LAND DEVELOPMENT CODE / Article 16 - STORMWATER MANAGEMENT DIVISION A. IN GENERAL / Division II - POST-CONSTRUCTION STORMWATER MANAGEMENT Subsequent to the final installation and stabilization of all permanent stormwater management practices shown on the approved stormwater management design plan and before the issuance of a certificate of occupancy the applicant is responsible for certifying that the project has been completed in accordance with the approved stormwater management design plan and submitting "as built" plans for all permanent stormwater management practices shown on the approved stormwater management design plan. The "as built" plans must show the final design specifications for all structural and nonstructural stormwater management practices and must be certified by a licensed landscape architect, professional surveyor, or professional engineer. A final inspection shall be conducted by the staff or representatives of the city to confirm the accuracy of the "as built" plans. A final inspection is required before any performance bond or other guarantee can be released. ## History (Ord. No. 42-2014, § 1, 10-10-2014)