Subsequent to the final installation and stabilization of all permanent stormwater management practices shown on the approved stormwater management design plan and before the issuance of a certificate of occupancy the applicant is responsible for certifying that the project has been completed in accordance with the approved stormwater management design plan and submitting "as built" plans for all permanent stormwater management practices shown on the approved stormwater management design plan. The "as built" plans must show the final design specifications for all structural and nonstructural stormwater management practices and must be certified by a licensed landscape architect, professional surveyor, or professional engineer. A final inspection shall be conducted by the staff or representatives of the city to confirm the accuracy of the "as built" plans. A final inspection is required before any performance bond or other guarantee can be released.