Tyrone · Zoning Ordinance
Part II - CODE OF ORDINANCES / Part B - LAND AND USE DEVELOPMENT / Chapter 113 - ZONING / Article VII - CONDITIONAL USES
Sec. 113-192. Telecommunications antennas and towers.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Purpose and intent. The purpose of this section is to establish minimum development standards for the regulation of commercial telecommunications transmission towers, including but not limited to, cellular and personal communications systems (PCS) towers, broadcasting towers, two-way radio towers, fixed-point microwave dishes, commercial satellites and receiving dishes, and related accessory equipment and buildings. The intent of this section is to: (1) to implement the provisions of the Telecommunications Act of 1996 on a local level; (2) to control placement of towers and antennas in a way that minimizes the adverse visual impact to nearby properties by locating towers and antennas in non-residential areas or in areas where the adverse impact on the community is minimal; and (3) to advocate the shared use of new and existing tower sites through co-location thereby discouraging the proliferation of towers throughout the Town of Tyrone.
(b) Applicability:
(1) District height limitations. The requirements set forth shall govern the location of towers that exceed, and antennas that are installed at a height in excess of the height limitations specified for each zoning district. The height limitations applicable to buildings and structures shall not apply to towers and antennas.
(2) Public property. Antennas and towers located on public property owned, leased, or otherwise controlled by the governing authority shall be exempt from the requirements of this section, provided a license or lease authorizing such antenna or tower has been approved by the governing authority.
(3) Amateur radio receive-only antennas. This section shall not govern any amateur radio tower, or the installation of any antenna, that is under 70 feet in height and is owned and operated by a federally-licensed amateur radio station operator or is used exclusively for receive-only antennas;
(4) Pre-existing towers and antennas:
a. Any tower or antenna previously permitted or currently in use on the effective date of this section shall not be required to meet the requirements of this section, other than the requirements of subsections (c)(5) and (c)(6) herein. Any such tower or antenna shall be referred to in this section as "pre-existing tower" or "pre-existing antenna";
b. Pre-existing towers or antennas that are not in use for a continuous period of 12 months shall be removed per subsection (g) herein. An annual "tower in use certification" shall be required per subsection (g) as well;
c. Where a pre-existing tower does not comply with the setback requirements of this section, co-location of antennas on such a tower may occur, provided that any proposed accessory equipment buildings placed within the existing fenced area meet the minimum setbacks of this section and that the height of the pre-existing tower is not increased by the proposed antenna. All other requirements of this section shall apply;
(5) Existing tower replacement. Replacement of an existing tower structure is permitted provided that all of the following apply:
a. The replacement tower is constructed on a site within close proximity to the existing tower at the same or greater setbacks than previously established;
b. The replacement tower complies with the height requirements for the area in which it is located;
c. The tower being replaced is removed from site within 15 calendar days from the issuance of the certificate of occupancy for the new tower;
d. Additional co-location opportunities on the new tower are made available with the minimum users required based on tower height;
e. Proposed accessory equipment buildings comply with established setbacks for existing tower facilities without increasing nonconformity; and
f. A site plan for the new tower facilities is administratively approved.
(c) General guidelines:
(1) Principal or accessory use. Antennas and towers may be considered either principal or accessory uses. The entire tower facility shall count as one principal or accessory use. A different existing use or an existing structure on the same lot shall not preclude the installation of an antenna or tower on such lot;
(2) Inventory of existing or planned tower sites. Each applicant for a new tower shall provide an inventory of all existing or planned tower sites in the town and within one-quarter mile of the border thereof. The zoning administrator may share such information with other applicants applying for approval under this section or other organizations seeking to locate antennas within the town; provided, however, that the zoning administrator is not, by sharing such information, in any way representing or warranting that such sites are available and/or suitable;
(3) Availability of suitable existing towers or structures for co-location. No new tower shall be permitted unless the applicant demonstrates to the satisfaction of the town that no existing tower, nor any towers in the approval process, can accommodate the applicant's proposed antenna. All evidence shall be signed and sealed by appropriate licensed professionals or qualified industry experts. An existing or planned tower would not be suitable for co-location for the following reasons:
a. No existing towers or structures located within the geographic area meet the applicant's engineering requirements, including, but not limited to, sufficient height, structural support strength, or electromagnetic interference with antenna(s) on the existing towers or structures;
b. The fees or costs required to co-locate on an existing tower or structure or to adapt an existing tower or structure for co-location are unreasonable. Costs exceeding new tower development are presumed unreasonable. The applicant shall submit in writing a detailed estimate of total development costs;
c. The applicant demonstrates that there are other limiting factors that render existing towers and structures unsuitable; or
d. Letters of rejection have been received for requests to co-locate on all existing and planned towers within the service area of the proposed tower.
(4) Site plan. Applicants shall submit a scaled site plan. Additional information must include maximum effective radiated power, tower height requirements, tower structure standards, access, landscaping, buffers, and other information necessary to assess compliance with this section. Any information of an engineering nature that the applicant submits, whether civil, mechanical, or electrical, shall be certified by a licensed professional engineer. Site plan submittal shall include completion of a tower application, signed and notarized by both the property owner and the tower company representative/agent;
(5) Aesthetics—Lighting. The following guidelines shall govern the aesthetics, installation and lighting of all towers and antennas:
a. Towers shall, subject to any applicable standards of the FAA, be painted a neutral color, so as to reduce visual obtrusiveness. Where possible, towers shall be designed to appear to be trees, or other natural features;
b. At a tower site, the design of the buildings and related structures shall use materials, colors, textures, screening, and landscaping that will blend the tower facilities to the natural setting and built environment;
c. If any antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color and texture of the supporting structure, and if roof-mounted shall be screened by a parapet wall, so as to make the antenna and related equipment visually unobtrusive;
d. Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. If lighting is required, the governing authority may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding views.
(6) Federal requirements. All towers must meet current standards and regulations of the FAA, the FCC, and any other agency of the federal government with the authority to regulate towers and antennas, including modulation studies on frequency usage to avoid interference with existing systems in operation. If such standards and regulations are changed, then the owners of the towers and antennas governed by this section shall bring such towers and antennas into compliance with such revised standards and regulations within six months of the effective date of such standards and regulations, unless a more stringent compliance schedule is mandated by the controlling federal agency. Failure to bring towers and antennas into compliance with such revised standards and regulations shall result in appropriate action by the Town of Tyrone. Prior to submittal for an administrative site plan approval, applicants shall be required to submit written approval from the FAA which states that the proposed communications tower does not encroach onto or through any established public or private airport approach path or federal airspace as established by the FAA;
(7) Building codes—Safety standards. To ensure the structural integrity of towers, the owner of a tower shall ensure that it is maintained in compliance with standards contained in applicable local building codes and the applicable standards for towers that are published by the electronic industries association, as amended from time to time. If upon inspection the governing authority concludes that a tower fails to comply with such codes and standards and constitutes a danger to persons or property, then upon notice being provided to the owner of the tower, the owner shall have 60 days to bring such tower into compliance. If the owner fails to bring such tower into compliance with such standards appropriate action will be taken by the Town of Tyrone.
(8) Application. Any application submitted for approval shall meet all of the guidelines listed above. Failure to meet all required guidelines shall result in denial of said application. All applicants for new tower construction shall include the following information at time of application submittal: site and landscape plans drawn to scale; a report including all tower specifications and a description of the tower with technical reasons for its design; documentation establishing the structural integrity for the tower's proposed uses; the general capacity of the tower and information necessary to assure that ANSI standards are met; a statement of intent on whether excess space will be leased; proof of ownership of the proposed site or authorization to utilize it; and copies of any easements necessary;
(9) Streamlined process for modification or co-location of wireless facilities:
a. Applications for co-location or modification of a wireless facility entitled to streamlined processing as described below shall be reviewed for conformance with applicable site plan and building permit requirements, including zoning and land use conformity, but shall not otherwise be subject to the issuance of additional zoning, land use, or special use permit approvals beyond the initial zoning, land use, or special permit approvals issued for such wireless support structure or wireless facility;
b. The streamlined process set forth above shall apply to applications for all modifications and to applications for all proposed co-locations that meet the following requirements:
(i) The proposed co-location shall not increase the overall height or width of the wireless support structure to which the wireless facilities are to be attached;
(ii) The proposed co-location shall not increase the dimensions of the equipment compound approved by the governing authority;
(iii) The proposed co-location shall comply with applicable conditions of approval, if any, applied to the initial wireless facilities and wireless support structure, as well as any subsequently adopted amendments to such conditions of approval;
(iv) The proposed co-location shall not exceed the applicable weight limits for the wireless support structure, as demonstrated by a letter from a structural engineer licensed to practice in the State of Georgia;
c. An applicant shall not be required to submit radio frequency analyses; however, the zoning administrator may require the applicant to provide a letter from a radio frequency engineer certifying the applicant's proposed wireless facilities will not interfere with emergency communications;
d. Within 90 calendar days of the date an application for modification or co-location of wireless facilities is filed with the zoning administrator, unless another date is specified in a written agreement between the governing authority and the applicant, the zoning administrator shall:
(i) Make his or her final decision to approve or disapprove the application;
and (ii) Advise the applicant in writing of his or her final decision;
e. Within 30 calendar days of the date an application for modification or co-location is filed with the zoning administrator, the zoning administrator shall notify the applicant in writing of any information required to complete the application. To the extent additional information is required to complete the application, the time required by the applicant to provide such information shall not be counted toward the 90 calendar day review period set forth above.
(d) Development requirements:
(1) Zoning districts allowed—M-1, M-2;
(2) Lot area. Tower facilities shall be on a lot which meets the minimum lot size for the district in which it is located. A tower may occupy a leased parcel being a portion of the lot (parent parcel). For the purposes of determining whether the installation of a tower or antenna complies with district development regulations, including, but not limited to, set back requirements, lot coverage requirements, and other such requirements, the dimensions of the entire lot shall control, even though the antennas or towers may be located on leased parcels within such lots. Towers that are constructed and antennas that are installed, in accordance with the provisions of this section shall not be deemed to constitute the expansion of a nonconforming use or structure.
(3) Setbacks:
a. All tower facilities shall be set back from adjoining properties in the A-R or residential zoning districts a distance equal to the height of the tower or 200 feet, whichever is greater;
b. All tower facilities shall be set back from adjoining properties in the nonresidential zoning districts a distance equal to the height of the tower or 100 feet, whichever is greater;
(4) All anchors for guyed towers shall comply with the minimum setbacks of the zoning district;
(5) Towers over 70 feet in height shall not be located within one mile from any existing or planned tower that is over 70 feet in height;
(6) Security fencing. The tower facilities shall be enclosed by a black or green vinyl-coated chain link fence not less than eight feet in height and shall be equipped with an appropriate anti-climbing device. Access to the communication tower shall be through a locked gate;
(7) Landscaping. As specified below, the regulations of the Tyrone Zoning Ordinance and/or Tyrone Land Development Standards shall apply:
a. A ten-foot buffer area shall surround all tower facilities. The buffer shall consist entirely of evergreens, and once installed shall be a minimum of six feet in height at time of planting;
b. Existing mature tree growth and natural land forms on the site shall be preserved to the maximum extent possible, as determined by the zoning administrator. In some cases, such as towers sited on large wooded lots, the zoning administrator may determine that natural growth around the property perimeter may be a sufficient buffer, in lieu of the required landscaping. If existing vegetation to remain is requested to count toward the landscaping requirements, all such information, including location, size, and type of vegetation shall be indicated on the site/landscape plan;
c. Landscaping shall be installed on the outside of the required fence;
(8) Maximum height for all towers and antennas is 199 feet. Tower height shall be measured from the natural grade of the ground at the location of the tower to the highest point of the tower, including any antenna. If minimal grading (elevation of one to two feet above natural grade) is required to level the ground for the tower base, tower height shall be measured from the finished grade approved by the zoning administrator; and
(9) Towers shall not be located on the same lot as a school or day-care center.
(e) Permitted uses:
(1) General. Permitted uses shall not require public hearings. Nevertheless, all such uses shall comply with subsections (c) and (d) of this section and all other applicable ordinances. Prior to the installation of any tower or antenna, the applicant shall provide written notice to the zoning administrator, which notice shall include the location, size, and configuration of such antenna. Written notice shall be certified by a licensed professional engineer;
(2) Specific permitted uses:
a. Installing an antenna on an existing structure, so long as said addition adds no more than 20 feet to the height of said existing structure (including buildings, light poles, water towers, or other free standing non-residential structures excluding signs). Total height of existing structure and new antenna shall be 199 feet or less;
b. Installing an antenna on any existing tower, so long as said addition adds no more than 20 feet to the height of said existing tower and said existing tower is not a pre-existing tower. Total height of existing tower and new antenna shall be 199 feet or less; and
c. Adding onto an existing mechanical or accessory building, or placement of additional equipment cabinets or buildings at a tower site as part of co-location.
(f) Public hearing required.
(1) General. The following provisions shall govern those towers which require a public hearing and approval by the mayor and council. All such uses shall comply with subsections (c) and (d) of this section and all other applicable ordinances. Applicants shall apply for a public hearing through the zoning administrator:
a. If the tower or antenna is not a permitted use, then a public hearing shall be required for the construction of a tower or the placement of an antenna in all zoning districts; and
b. In granting an approval, the mayor and council may impose conditions to the extent they conclude such conditions are necessary to minimize any adverse effect of the proposed tower on adjoining properties.
(2) Factors considered in public hearing applications. The mayor and council shall consider the following factors in determining whether to approve an application, although the mayor and council may waive or reduce the burden on the applicant of one or more of these criteria, if in the sole discretion of the mayor and council, the goals of this section are better served thereby:
a. Height of the proposed tower;
b. Proximity of the tower to residential structures and residential zoning district boundaries;
c. Nature of uses on adjacent and nearby properties;
d. Surrounding topography;
e. Surrounding tree coverage and foliage;
f. Design of the tower, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness; and
g. Proposed ingress and egress.
(g) Tower in use certification and removal of abandoned antennas and towers. An annual tower in use certification will be required for any tower or antenna previously permitted or currently in use on the effective date of this section. Said certification shall be submitted to the zoning administrator signed and notarized by the tower company representative/agent by the 31st of January each year. Any antenna or tower, including pre-existing towers and antennas, that are not in use for a period of 12 months shall be considered abandoned, and the owner of such antenna or tower shall remove same within 90 days of receipt of notice from the governing authority notifying the owner of such abandonment. If there are two or more users of a single tower, then this provision shall not become effective until all users cease using the tower.
(h) Performance bond required. Prior to the issuance of a zoning compliance certificate to erect a new tower structure, every applicant shall be required to deposit a performance bond with the Town of Tyrone. The amount of the bond shall be not less than $5,000.00 nor more than ten percent of construction costs, as determined by the zoning administrator. Such bond shall be required upon compliance with all aspects of this section and shall be applicable to any assignee and owner of any permit granted hereunder, or any employee, contractor, subcontractor, or other party performing services in connection with any certificate of zoning compliance issued by the zoning administrator. The required performance bond shall be released only upon demolition of the tower and restoration of the site to the pre-development conditions. The format of the bond shall be approved by the town attorney.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.