--- title: Union Point Zoning Ordinance, 11.3.8. The layout of off-street parking and loading space; and collection: local-codes id: local-code:union-point/zoning/11.3.8 cite_as: Union Point, Ga., Zoning Ordinance ยง 11.3.8 canonical_url: https://georgiacommons.org/code/local/union-point/zoning/11.3.8 md_url: https://georgiacommons.org/code/local/union-point/zoning/11.3.8.md text_url: https://georgiacommons.org/code/local/union-point/zoning/11.3.8/text source_url: https://library.municode.com/ga/union_point/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:union-point jurisdiction_name: Union Point place_fips: "1378380" corpus_version: local-codes-union-point-c9956207a97c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/union-point/zoning/~appendix-a/~article-xi.md previous: https://georgiacommons.org/code/local/union-point/zoning/11.3.md next: https://georgiacommons.org/code/local/union-point/zoning/11.4.md index: https://georgiacommons.org/code/local/union-point.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:union-point/zoning/11.3.8@2026-11-11-31db81e495 --- # Union Point Zoning Ordinance, 11.3.8. The layout of off-street parking and loading space; and > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article XI - ENFORCEMENT AND ADMINISTRATION 11.3.9 Such other information as may be essential for determining whether the provisions of this ordinance are being observed. One copy of such plans shall be returned to the owner or agent when such plans shall have been approved by the building inspector. The lot and location of the building thereon shall be staked out on the ground and approved by the building inspector before starting any construction. If the proposed excavation, filling or construction as set forth in the application are in conformity with the provisions of this ordinance and other ordinances of the city then in force, the building inspector shall issue a building permit upon payment of the required fee. If a building permit is refused, the building inspector shall state the cause of the refusal in writing within three working days after such refusal. Construction shall be started within six months from the date of issuance of the building permit or the permit shall be revoked. Record of application and plats or plans shall be kept by the building inspector.