6.7.1 In any commercial (C-1, C-2) or industrial (M-1) district, any operation not conducted within a building, such as outdoor recreation, outdoor storage of materials, and outdoor servicing activities, shall be enclosed by a wall or fence of solid appearance or tight evergreen hedge not less than six feet in height. There shall be a buffer area at least 30 feet wide, unless otherwise specified, that adequately interrupts vision and diffuses the transmission of sound. All buffer area requirements are in addition to the area, yard, and height requirements for that district (article VIII). A landscaping plan identifying all plants to be incorporated in the buffer area must be approved by the mayor and council prior to any site construction. 6.7.2 In any district not subject to the requirements of section 6.7.1 but requiring screening of a specified operation, such screening shall be a wall or fence of solid appearance or tight evergreen hedge not less than six feet in height. There shall be a buffer area at least 30 feet wide, unless otherwise specified, that adequately interrupts vision and diffuses the transmission of sound. All buffer area requirements are in addition to the area, yard, and height requirements for that district (article VIII). A landscaping plan identifying all plants to be incorporated in the buffer area must be approved by the mayor and council prior to any site construction. 6.7.3 A vegetation buffer strip of 50 feet in width shall be planted adjacent to the lot line when the following conditions exist or are created: (a) A structure exists or is concentrated on a lot of which the side and/or rear lot line is a district boundary. (b) The district on the opposite side of the boundary is R-1, R-1A, R-2, R-3. The buffer strip required under section 6.7.3 shall be in addition to any other required buffer strip. The buffer strip shall be planted in the setback area and shall consist of evergreen trees and/or shrubs which will normally obtain a height of eight feet within five years. Maintenance of the buffer strip shall be the responsibility of the property owner. Dead trees or shrubs used in the buffer zone shall be replaced by the property owner no later than the next spring or fall planting season but no later than 12 months from notification by the building inspector. 6.7.4 If the buffer area is naturally wooded, then it shall be left in its natural state. If not, the buffer area, in addition to the required wall, fence, or tight evergreen hedge, should be planted with trees to further diffuse the sound and light transmission and visual impact of the building. The addition of the required wall, fence, or tight evergreen hedge shall be constructed or planted in such a manner as to preserve the natural topography of the land and the natural growth. If the natural growth is too dense for preferred growth, the natural growth may be thinned. Under all circumstances, diseased, dangerous or decayed growth shall be removed. 6.7.5 Outdoor lighting of all types shall be directed so as to reflect away from all residential dwellings, and shall be so situated as not to reflect directly into any public rights-of-way. 6.7.6 Any grading, improvements or construction adjacent thereto shall be conducted far enough from the buffer area so as not to disturb or encroach upon the buffer area.