10-3. Application for Building Permit.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All applications for building permits, except single-family residential, shall be accompanied by five site plans drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units the building is designed to accommodate, the setback lines of the building on the "permit lot," the various easements on the lot and such other information as may be essential for determining whether the provisions of this ordinance are being observed. The following is required on the site plan before the site plan is considered accepted by the director of inspections and any permits are approved:

a. City Engineer Approval:

1. Topography (MSL) existing and proposed.

2. Drainage plans.

3. Location and size of ingress/egress.

4. Water and sewer mains and services, both existing and proposed.

5. All other utility services or distribution lines (Georgia Power Company, Southern Bell Telephone, Georgia Natural Gas, Cable TV).

b. Fire Chief Approval:

1. Water (Class A fire hydrant).

c. Director of Utilities Approval:

1. Water and sewer services in the lot and the specific meter size and location.

The other required drawings to include structural, plumbing, electrical, heat and air, shall be submitted in two sets. All of the drawings shall be resubmitted, if during the city's review there are major changes made to them (major changes refers to omitted items that are required or where the number of changes to a drawing are over three items or when the handwritten changes would cause confusion or make the drawings unusable). The city shall have at the time the permit is issued two complete accurate plans. One set of plans, including the site plan, shall be kept on the job site where all of the various inspection departments shall have access during the construction and final inspection phase.

Any building permit shall become void if the work involved has not begun within six months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six months after the work of development is commenced; provided that extensions of time for periods not exceeding six months each may be allowed in writing by the Zoning Administrator. Any unapproved deviation from the site plan shall cause the Building Official to not issue a certificate of occupancy.

Single-family residential site plans need not be drawn to scale, but must be accurate as to dimensions of lot and proposed building.

The applicant for a building permit shall submit a certificate with his/her application which certifies that the lot which he proposes to develop is a lot of record. When the lot in question does not met the lot width and lot area requirements of this ordinance, then the applicant shall certify that such lot was a lot of record prior to the adoption of this ordinance or is a lot which has been created through governmental taking of property.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:valdosta/zoning/10-3@2026-11-11-842280bde2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Valdosta Zoning Ordinance, 10-3. Application for Building Permit | Georgia Commons