--- title: "Valdosta Zoning Ordinance, 8-9.3. Cost of Installation:" collection: local-codes id: local-code:valdosta/zoning/8-9.3 cite_as: Valdosta, Ga., Zoning Ordinance ยง 8-9.3 canonical_url: https://georgiacommons.org/code/local/valdosta/zoning/8-9.3 md_url: https://georgiacommons.org/code/local/valdosta/zoning/8-9.3.md text_url: https://georgiacommons.org/code/local/valdosta/zoning/8-9.3/text source_url: https://library.municode.com/ga/valdosta/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:valdosta jurisdiction_name: Valdosta place_fips: "1378800" corpus_version: local-codes-valdosta-1ea06aa7b7af publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/valdosta/zoning/~appendix-b.md previous: https://georgiacommons.org/code/local/valdosta/zoning/8-9.md next: https://georgiacommons.org/code/local/valdosta/zoning/8-10.md index: https://georgiacommons.org/code/local/valdosta.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:valdosta/zoning/8-9.3@2026-11-11-c841da7793 --- # Valdosta Zoning Ordinance, 8-9.3. Cost of Installation: > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS / 8 - MINIMUM IMPROVEMENTS In order to partially defray the cost of installation of street lighting, the developer shall be required to pay a lump sum fee to the City of Valdosta for each street light required under the provisions of this ordinance. The fees for streetlights will be as follows: Where underground distribution is used, the cost per light shall be the cost as per the contribution-in-aid-of-construction of the utility company; where overhead distribution is used, there shall be no cost. Before the minimum improvements are accepted by the city, a check payable to the City of Valdosta must be furnished for the total cost of the streetlights as determined above and as described in the streetlight layout plan. 8-9.4. Actions Prior to Construction: In order that the expense outlined herein may be ascertained and understood prior to commencement of construction, the developer or his engineer will confer with the city engineer and mark on the plans the approximate location for each fixture. 8-9.5. Location of Underground Installations: The plans submitted to the city engineer will set forth the exact location of all underground installations.