4-3.1. Utility: Unless underground utilities are provided, utility easements for overhead services shall be located at the rear or side of and adjacent to the lot lines and shall be a minimum width of 20 feet. Where possible, water lines shall be located outside the curbline on the west and south sides of streets; sewer and gas lines shall be on the east and north sides. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase they shall be platted within said subdivision or phase thereof. Water and sewer lines outside of street rights-of-way shall follow side and rear property lines where possible and a minimum easement width of 20 feet shall be provided unless it is determined by the city engineer that a greater width is necessary for maintenance or construction. 4-3.2. Drainage: Drainage easements shall be provided as required by the city engineer after review of the construction plans. Drainage easements outside of street rights-of-way shall follow side and rear property lines where possible and shall have a minimum easement width of 20 feet unless it is determined by the city engineer that a greater width is necessary for maintenance and construction.