6-2.1. No work shall commence prior to approval of the complete set of construction plans.

The construction drawings shall consist of the following:

a. Preliminary final plat. The preliminary final plat shall conform to the approved preliminary plat. If desired by the subdivider, the final plat may constitute only that portion of the preliminary plat that he proposes to record at that time provided that such portion conforms with all requirements of these regulations.

b. Plans and profiles and typical road sections for streets.

c. Location, calculations and profiles for all drainage structures.

d. Detailed plans of all intersections showing drainage at intersections at scale one inch equals 50 feet or more detailed.

e. Water and sanitary sewer plans including both on-site and off-site lines that are to be constructed.

f. Site grading and clearing. Plans with soil erosion control structures and devices.

g. Denote any 100-year floodplain or statement that property does not lie within the 100-year floodplain.

6-2.2. The subdivider shall submit two sets of the construction drawings and the supplementary data to the city engineer and allow seven days for study of the plans. The action and/or recommendations shall be noted on the plans and returned to the submitter. After changes are made by the submitter these shall become final. Two sets of construction plans shall be required to be stamped and signed to approve the conditions set before any work begins. Additional sets of plans may be submitted to be stamped for the developer's use. One copy of the approved construction plans must be at the job site whenever work is in progress.

6-2.3. Upon approval of the construction plans by the city engineer, the subdivider shall submit two copies of the plat to each of the other utility companies including the power company, the gas company, the telephone company, and cable television. These companies shall mark their proposed facilities on the plat and return one copy to the subdivider for preparation of a utility drawing.

6-2.4. The following permits shall be taken out before each phase of work commences. These are available at no cost from the office of the city engineer upon submittal of the appropriate bonds as described in section 9.

a. Grading permit (prior to any grading or clearing).

b. Storm drainage, if separate from grading.

c. Sanitary sewer.

d. Water.

e. Curbing and paving.

f. Telephone, power, gas, cable television, etc.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:valdosta/zoning/appendix-b-6-2@2026-11-11-0f3bb7f209

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.