Skip to content
Georgia Commons
Menu

Waleska · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 6 - BUILDINGS AND BUILDING REGULATIONS / Article II - FLOODPLAIN MANAGEMENT/FLOOD DAMAGE PREVENTION / Division 3 - DEVELOPMENT STANDARDS

Sec. 6-114. Engineering study requirements for floodplain encroachments.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of section 6-154 apply. This study shall be prepared by a currently registered professional engineer in the state and made a part of the application for a permit. This information shall be submitted to and approved by the local permitting authority prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. Such study shall include:

(1) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;

(2) Step-backwater analysis, using a FEMA-approved methodology approved by the local permitting authority. Cross sections (which may be supplemented by the applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles;

(3) Floodplain storage calculations based on cross sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development;

(4) The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.

History

The history line the source prints at the end of the section.

(Ord. of 2010(1), § 2(4.4))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:waleska/zoning/6-114@2026-11-11-d99a97ad80

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Waleska Zoning Ordinance, Sec. 6-114. Engineering study requirements for floodplain encroachments | Georgia Commons